NSPCL has played significant role in turnaround of the captive units of SAIL.
CPP-II Durgapur was taken over by NSPCL on 07.03.2001. The plant load factor jumped from 63.47% in 2000-01 to station best of 98.74% in 2011-12. The PLF during 2021-22 was 94.19%.
CPP-II Rourkela was taken over by NSPCL on 07.03.2001. The plant load factor has increased from 94.06% in 2000-01 to 99.24% in 2010-11. The PLF during 2021-22 was 93.45%.
CPP-II Bhilai was taken over by NSPCL on 19.03.2002. The plant load factor improved from 88.30% in 2001-02 to 94.52% in 2007-08. The Deemed PLF during 2016-17 FY was 94.75%.