Download Icon (For downloading Detailed NIT/NIEA/NIEOI/ Corrigendum etc) | Notice Type | Type of Bidding (DCB/ ICB) | IFB/NIT/NIEA/NIEOI Ref no | IFB/NIT/NIEA/NIEOI Date | Pkg No/ID | Name of Package | Bid Doc Sale Period Start Date | Bid Doc Sale Period Close Date | Schedule Bid Opening Date | Tender Coordinator emails | ||||||||||||||||||||||||||||||
2020-21 | ||||||||||||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: SSC/OT/31/2020-21 | 09/01/2021 | SSC: 2800005299 | Supply of 01 NO OIL FREE AIR SCREW COMPRESSOR ALONG WITH DRIER FOR Instrument Air SYSTEM For NSPCL Bhilai PP-II |
09/01/2021 | 22/01/2021 | 29/01/2021 | gaurav.nimje@nspcl.co.in, rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/18/2020-21/9000005154 | 24/12/2020 | SSC: 20160 | Deployment of Hired Vehicles at Various Departments for 08 Hrs. & 24 Hrs. duty at NSPCL-Bhilai. |
24/12/2020 | 07/01/2021 | 14/01/2021 | rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/28/2020-21/2800005657 | 22/12/2020 | SSC/ 20275 | MAINTENANCE CONTRACT FOR BOILER & AUX AND OFFSITE (for six months), Durgapur, PP2. |
22/12/2020 | 04/01/2021 | 11/01/2021 | rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/27/2020-21/2800005642 | 21/12/2020 | SSC/: 20269 | Transportation of pond ash from NSPCL Bhilai PP-3 ash dyke to Raipur-Kodebed (section from KM 10.2000 to KM 43.4) NH-43 road project to NHAI package-VI.(For 1,00,000 Cum Quantity). |
21/12/2020 | 08/01/2021 | 14/01/2021 | sudeepk.das@nspcl.co.in; rashmikumari@nspcl.co.in; prabhulinga@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: SSC/OT/26/2020-21 | 16/12/2020 | SSC: 2800005574 | 220V DC PACKAGE FOR PP-II, NSPCL BHILAI . |
11/01/2021 | 18/01/2021 | 29/01/2021 | ushakumari@nspcl.co.in, rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/24/2020-21/2800005599 | 16/12/2020 | SSC/: 20254 | Biennial Contract for Civil Maintenance & Miscellaneous Works for Expansion power plant, NSPCL-Bhilai(Yr-2021-2023). |
16/12/2020 | 04/01/2021 | 11/01/2021 | prabhulinga@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: SSC/OT/27/2020-21 | 07/12/2020 | SSC: 2800005495 | Procurement of Grinding Rings & Grinding Ball for Ball and Race Mill |
15/01/2021 | 22/01/2021 | 29/01/2021 | ushakumari@nspcl.co.in, rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/22/2020-21/2800005573 | 07/12/2020 | SSC/: 20241 | Supply, erection & Commissioning of OLEMS at NSPCL, PP-3 BHILAI |
07/12/2020 | 24/12/2020 | 31/12/2020 | sudeepk.das@nspcl.co.in; rashmikumari@nspcl.co.in; prabhulinga@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. SSC/OT/28/2020-21/2800005578 | 05/12/2020 | 2800005578 | SUPPLY OF SELF PROPELLED ARTICULATED BOOM LIFT FOR SWITCHYARD , PP3 NSPCL Bhilai |
02/01/2021 | 09/01/2021 | 15/01/2021 | rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/23/2020-21/2800005572 | 28/11/2020 | SSC/ 20245 | Transportation of coal from Manikpur mine end to railway siding & loading in Indian Railway wagons for onward transportation to NSPCL Bhilai (PP-3). |
28/11/2020 | 07/12/2020 | 11/12/2020 | rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/21/2020-21/2800005523 | 27/11/2020 | SSC/: 20230 | Repair and Rehabilitation of CW pump foundations & TG roof, NSPCL Expn Power plant, Bhilai |
28/11/2020 | 19/12/2020 | 28/12/2020 | rashmikumari@nspcl.co.in; prabhulinga@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/15/2020-21/2800005353 | 24/11/2020 | SSC/ 20155 | BMC for maintenance of Milling system and Rotary Equipments of Rourkela(PP-2). |
24/11/2020 | 10/12/2020 | 17/12/2020 | rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/17/2020-21/2800005431 | 20/11/2020 | SSC/20162 | Repairing/ Strengthening of Concrete structures of Two(2) nos. of Cooling Towers(C.T.) at NSPCL, Durgapur(PP-II). |
09/12/2020 | 17/12/2020 | 24/12/2020 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
20/11/2020 | Submission of EOI For Collection of Dry fly ash from Public silo |
30/11/2020 | as.farooqui@nspcl.co.in | |||||||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/2020-21/03 | 09/11/2020 | 2007062 | BMC for Regular Track Maintenance of Wagon Tippler and MUTH at NSPCL, Rourkela. |
20/11/2020 | 10/01/2021 | 22/01/2021 | ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: SSC/OT/22/2020-21 | 27/10/2020 | SSC: 2800005291 | Supply of Economiser Coil ,NSPCL Durgapur |
27/10/2020 | 06/11/2020 | 13/11/2020 | ushakumari@nspcl.co.in, rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800005455/CS/OT/05/2020-21 | 10/10/2020 | CS:20062 | POND ASH EXCAV., LOADING & TRANSPORTATION FOR FILLING LOW LAND AREA |
21/10/2020 | 10/11/2020 | 13/11/2020 | bk.kundu@nspcl.co.in. dk.rajwani@nspcl.co.in nspcldgp.cm@gmail.com | |||||||||||||||||||||||||||||||
NIT | DCB | NIT Ref. No. 0230/SSC-50131/SC-OT-12/2020-21/2800005262 | 15/10/2020 | SSC/20131 | OH OF MILLING SYSTEMS FOR 02 YEARS NSPCL-Durgapur (PP-II) |
15/10/2020 | 20/11/2020 | 26/11/2020 | rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800005392/CS/OT/04/2020-21 | 21/09/2020 | CS:20058 | BIENNIAL MAINTENANCE CONTRACT OF AC AND REFRIGERATORS AT PLANT & TOWNSHIP |
09/10/2020 | 07/11/2020 | 11/12/2020 | bk.kundu@nspcl.co.in. dk.rajwani@nspcl.co.in nspcldgp.cm@gmail.com | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/19/2020-21/2800005430 | 07/10/2020 | SSC/: 20200 | Site levelling and development at PP-3 plant area by using PP-2 pond ash for filling material with soil cover. |
04/11/2020 | 12/11/2020 | 19/11/2020 | sudeepk.das@nspcl.co.in; rashmikumari@nspcl.co.in; prabhulinga@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT REF. NO. 0230/SSC/OT/13/2020-21/2800005342 | 14/09/2020 | SSC/20140 | BMC OF TG & OFFSITE (FY.2020-22), NSPCL, ROURKELA PP-2 |
14/09/2020 | 28/09/2020 | 05/09/2020 | rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/16/2020-21/2800005313 | 02/09/2020 | SSC/ 20110 | Biennial Maintenance Contract for TG Offsite Area & DM Plant of PP-II, NSPCL, Bhilai. |
03/09/2020 | 17/09/2020 | 21/09/2020 | ||||||||||||||||||||||||||||||||
NIT | DCB | 2800005284/CS/OT/03/2020-21 | 17/08/2020 | CS:20049 | POND ASH EXCAVATION & TRANSPORTATION |
29/08/2020 | 18/09/2020 | 23/09/2020 | bk.kundu@nspcl.co.in. dk.rajwani@nspcl.co.in nspcldgp.cm@gmail.com | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/08/2020-21/2800004993 | 18/08/2020 | SSC/: 20066 | Biennial Civil and Hort. Maint. Work at PP-II, NSPCL, Bhilai. |
18/08/2020 | 07/09/2020 | 14/09/2020 | prabhulinga@nspcl.co.in, rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
30/07/2020 | Submission of EOI for collection of Pond Ash/Dry Ash |
10/08/2020 | farooqui@nspcl.co.in | |||||||||||||||||||||||||||||||||||||
NIT | DCB | 2800005052/CS/OT/02/2020-21 | 12/06/2020 | CS:20033 | HIRING OF VEHICLES FOR DEPARTMENTAL USE |
17/07/2020 | 11/08/2020 | 14/08/2020 | bk.kundu@nspcl.co.in. dk.rajwani@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/09/2020-21/2800005123 | 07/07/2020 | SSC/: 20037 | BMC for APH, ESP, FANs, Duct- Damper and Overhauling of fans in ( 2x250 MW ) units of NSPCL- Bhilai expansion plant (2020-22). |
07/07/2020 | 28/07/2020 | 06/08/2020 | a.dasgupta@nspcl.co.in; siladri.moharana@nspcl.co.in; prabhulinga@nspcl.co.in | |||||||||||||||||||||||||||||||
NSPCL/DGP/AU/2020-21/EOI-01 | 30/06/2020 | EXPRESSION OF INTEREST(EOI) FOR LIFTING POND ASH/DRY FLY ASH |
31/07/2020 | |||||||||||||||||||||||||||||||||||||
NIT | DCB | CS:20030 | 28/05/2020 | CS:20030 | Biennial Rate Contract for Rewinding & Repairing of HT Motor. |
18/06/2020 | 09/07/2020 | 13/07/2020 | bk.kundu@nspcl.co.in. dk.rajwani@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/06/2020-21/2800004956 | 03/06/2020 | SSC/: 20053 | Brick paving work in miscellaneous area of expansion power plant, NSPCL-Bhilai. |
04/06/2020 | 25/06/2020 | 02/07/2020 | a.dasgupta@nspcl.co.in; siladri.moharana@nspcl.co.in; prabhulinga@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/07/2020-21/2800004974 | 01/06/2020 | SSC/: 20061 | Supply, supervision of Installation & commissioning of Flame Scanners in 2 Boilers. |
01/06/2020 | 21/06/2020 | 29/06/2020 | a.dasgupta@nspcl.co.in; siladri.moharana@nspcl.co.in; prabhulinga@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/20-21/02 | 21/05/2020 | 2016006 | Deployment of excavator at Ash Dyke of NSPCL, Rourkela for Lifting & Loading of Pond Ash |
21/05/2020 | 09/06/2020 | 16/06/2020 | r.k.verma@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.9000005011 | 03/03/2020 | 9000005011 | Procurement of PCs, Printers, Scanners & UPS |
23/05/2020 | 25/07/2020 | 18/08/2020 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/2020-21/01 | 15/05/2020 | 2008003 | SUPPLY AND FIXING, INSTALLATION OF FIRE SEALING COMPOUND AT NSPCL ROUKELA. |
15/05/2020 | 20/06/2020 | 30/06/2020 | r.k.verma@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/01/2020-21/2800004834 | 30/04/2020 | SSC/: 19143 | COMPLETE REFURBISHMENT OF CT CELLS FOR PP-II,NSPCL,BHILAI |
07/08/2020 | 17/08/2020 | 24/05/2020 | a.daspupta@nspcl.co.in; siladri.moharana@nspcl.co.in; prabhulinga@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/03/2020-21/2800004857 | 21/04/2020 | SSC/ 20029 | Biennial maintenance contract for coal & oil firing system Ash handling system ESP and Ash brick M/c. |
04/05/2020 | 08/06/2020 | 15/06/2020 | siladri.moharana@nspcl.co.in rnshukla@nspcl.co.in prabhulinga@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. SSC/OT/01/2020-21/2800004815 | 28/04/2020 | 2800004815 | Aerial Work Platform For Switchyard ,PP-III, NSPCL-Bhilai |
28/04/2020 | 13/05/2020 | 19/05/2020 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/04/2020-21/2800004873 | 24/04/2020 | SSC/: 20036 | Biennial Civil Maintenance Contract for Ash Dyke of Power Plant-II and Power Plant-III at NSPCL Bhilai. |
29/04/2020 | 15/05/2020 | 21/05/2020 | prabhulinga@nspcl.co.in, siladri.moharana@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/SSC/OT/02/2020-21/2800004825 | 11/04/2020 | SSC/ 19183 | Annual maintenance contract for DAETP. |
28/04/2020 | 18/05/2020 | 25/05/2020 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/16/2019-20/2800004774 | 04/04/2020 | SSC/19177 | General civil maintenance inside plant of NSPCL Durgapur |
16/04/2020 | 13/05/2020 | 21/05/2020 | siladri.moharana@nspcl.co.in ; rnshukla@nspcl.co.in; a.dasgupta@nspcl.co.in | |||||||||||||||||||||||||||||||
2019-20 | ||||||||||||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: 0230/SSC/CS/OT/11/2019-20/2800004679 | 18/03/2020 | SSC/:19152 | Annual contract for unloading of coal from wagons placed at Track Hopper and supply of manpower at CHP of Expansion Power Plant, NSPCL-Bhilai. |
15/04/2020 | 28/04/2020 | 04/05/2020 | a.daspupta@nspcl.co.in; siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/13/2019-20/2800004666 | 04/03/2020 | SSC/19160 | MISCELLANEOUS CIVIL MAINTENANCE WORKS IN TOWNSHIP FOR NSPCL,DURGAPUR |
20/03/2020 | 10/04/2020 | 17/04/2020 | a.daspupta@nspcl.co.in; siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : SSC/OT/14/2019-20/2800004469 | 18/03/2020 | 2800004469 | Supply of 250NB CI pipe for ash slurry system |
08/04/2020 | 21/04/2020 | 28/04/2020 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/10/2019-20/2800004695 | 16/03/2020 | SSC/ 19148 | RLA Study of Boiler, Turbine and Generator for U#1, PP-II,NSPCL-Durgapur. |
16/03/2020 | 18/05/2020 | 25/05/2020 | rashmikumari@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/09/2019-20/2800004638 | 22/02/2020 | SSC/19150 | Development and Maintenance of Lawns & Gardens inside plant of NSPCL Durgapur PP-2. |
07/03/2020 | 07/05/2020 | 14/05/2020 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.9000004985 | 05/02/2020 | 9000004985 | Procurement of 6.6 KV, 2000 KW BFP Motor |
04/03/2020 | 06/06/2020 | 19/06/2020 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/19-20/08 | 29/02/2020 | 1908081 | Biennial Miscellaneous electrical maintenance work, NSPCL, Rourkela |
04/03/2020 | 20/03/2020 | 24/04/2020 | r.k.verma@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/2019-20/ 07 | 29/02/2020 | 1909082 | Construction and repair of Bitumen Macadam road (BT) from RSP Modernization Chowk to NSPCL Gate No.1 at NSPCL CPP-II, Rourkela. |
01/03/2020 | 20/03/2020 | 27/03/2020 | r.k.verma@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO. : 0230/SSC/OT/05/2019-20/2800004410 | 18/12/2019 | SSC/19053 | Monitoring and Management of Water Quality, Operation of WCTP (DM Plant & PT Plant) and other services at Power Plant-2, NSPCL-Bhilai. |
18/12/2019 | 04/01/2020 | 09/01/2020 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.9000004890 | 09/10/2019 | 9000004890 | Procurement of Boiler Superheater & Waterwall Tubes/Bends |
24/10/2019 | 18/11/2019 | 03/12/2019 | ||||||||||||||||||||||||||||||||
NIT | DCB | 2800004227/CS/OT/07/2019-20 | 24/09/2019 | CS:19095 | AMC for HT-LT Motor maintenance at CPP-II |
10/10/2019 | 31/10/2019 | 04/11/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, somrrita.deb@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/SSC/CS/OT/01/2019-20 | 05/10/2019 | SSC/CS/19022 | Quality Management of Steam Water & Operation of Water Treatment Plants, Expansion Power Plant, NSPCL-Bhilai |
07/10/2019 | 24/10/2019 | rashmikumari@nspcl.co.in | ||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/19-20/04 | 09/09/2019 | 1914040 | Cooling Water Treatment at NSPCL Rourkela |
11/09/2019 | 18/10/2019 | 01/11/2019 | shampa.biswas@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: SSC/OT/02/2019-20 | 18/09/2019 | 1100007271 | Procurement of Grinding Rings and Grinding Balls for Ball & Race Mill. |
18/09/2019 | 05/10/2019 | ushakumari@nspcl.co.in, rashmikumari@nspcl.co.in | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT NO.: SSC/OT/02/2019-20 | 18/09/2019 | SSC: 1100007071 | Procurement of Grinding Rings and Grinding Balls for Ball & Race Mill. |
18/09/2019 | 05/10/2019 | ushakumari@nspcl.co.in, rashmikumari@nspcl.co.in | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/19-20/04 | 09/09/2019 | 1917040 | Cooling Water Treatment at NSPCL Rourkela |
11/09/2019 | 23/09/2019 | 04/10/2019 | shampa.biswas@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/19-20/03 | 09/09/2019 | 1914041 | Biennial Maintenance Contract of DAETP for NSPCL Rourkela |
11/09/2019 | 30/09/2019 | 04/10/2019 | shampa.biswas@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/2019-20/02 | 09/09/2019 | 1916047 | NSPCL, Rourkela invites Sealed Tender for the works from reputed Agencies for Manufacturing of Fly Ash Brick. |
10/09/2019 | 23/09/2019 | 08/10/2019 | a.k.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800004115/CS/OT/06/2019-20 | 06/08/2019 | CS:19080 | AMC for Boiler & AUX and Offsite |
09/08/2019 | 28/08/2019 | 02/09/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/09/2019-20 | 27/07/2019 | CS: 19100 | Biennial contract for environment monitoring work at PP-2 (74MW) & Expansion Power Plant-PP3 (2x250MW) of NSPCL-Bhilai. |
29/07/2019 | 16/08/2019 | 22/08/2019 | Bk.kundu@nspcl.co.in, monikasagar@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003994/CS/OT/05/2019-20 | 04/07/2019 | CS:19063 | Overhauling of ID & FD Fans, Ducts, Dampers and ESP |
23/07/2019 | 10/08/2019 | 14/08/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003996/CS/OT/05/2019-20 | 04/07/2019 | CS:19008 | Overhauling of Pressure Parts & Rotary Air Pre-Heaters. |
23/07/2019 | 10/08/2019 | 12/08/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/08/2019-20 | 16/07/2019 | CS: 19083 | Annual contract for unloading of coal from wagons placed at Track Hopper and deployment of manpower at CHP of Expansion Power Plant, NSPCL-Bhilai |
17/07/2019 | 03/08/2019 | 12/08/2019 | Bk.kundu@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/07/2019-20 | 27/06/2019 | CS: 19026 | Biennial contract for Horticulture work at different areas of PP-III, at NSPCL- Bhilai (2019-21). |
01/07/2019 | 22/07/2019 | 29/07/2019 | bk.kundu@nspcl.co.in monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/06/2019-20 | 13/06/2019 | CS: 17236 | External Painting of Chimney of 2x250 MW Expansion Power Plant,NSPCL-Bhilai. |
14/06/2019 | 05/07/2019 | 11/07/2019 | prabhulinga@nspcl.co.in, monikasagar@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003766/PUR/OT/04/2019-20 | 11/05/2019 | PUR:190013 | Supply of Coal Burner Assembly. |
10/06/2019 | 29/06/2019 | 03/07/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003765/CS/OT/04/2019-20 | 11/05/2019 | CS:19009 | Overhauling of Milling System. |
10/06/2019 | 23/07/2019 | 26/07/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/05/2019-20 | 24/05/2019 | CS: 18104 | Construction of slope drain & dowel wall over MGR embankment and construction of labour shed for CHP at NSPCL, Expansion Power Plant. |
24/05/2019 | 14/06/2019 | 20/06/2019 | prabhulinga@nspcl.co.in, monikasagar@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/2019-20/01 | 22/05/2019 | 1809155 | Biennial Plant Civil Maintenance Works 2019-2021 at NSPCL CPP-II, Rourkela |
23/05/2019 | 08/06/2019 | 25/06/2019 | shampa.biswas@nspcl.co.in, ak.sahoo@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2019-20 | 13/05/2019 | CS: 18103 | Internal Painting of Structural Steel work in TG Building at Expansion Power Plant, NSPCL-Bhilai. |
14/05/2019 | 06/06/2019 | 13/06/2019 | rashmikumari@nspcl.co.in, prabhulinga@nspcl.co.in monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2019-20 | 13/05/2019 | CS: 18104 | Painting of Boundary wall, CHP tunnel, Internal & External of misc. buildings at Expansion Power Plant, NSPCL-Bhilai. |
14/05/2019 | 06/06/2019 | 13/06/2019 | rashmikumari@nspcl.co.in, prabhulinga@nspcl.co.in monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/02/2019-20 | 07/05/2019 | CS: 18261 | Biennial Contract for Assistance in Operation of Coal Handling Plant of Expansion Power Plant, NSPCL-Bhilai. |
08/05/2019 | 30/05/2019 | 06/06/2019 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2019-20 | 04/05/2019 | CS: 19030 | Transportation of coal from mine end to railway siding & loading in Indian Railway wagons for onward transportation to NSPCL-Bhilai. |
06/05/2019 | 20/05/2019 | 27/05/2019 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | ICB | CC/C&M/C-541 | 23/04/2019 | CC/C&M/C-541 | Renovation and Modernization of RAPH at Durgapur Captive Power Plant-II (2X60 MW). |
23/04/2019 | 30/04/2019 | 23/05/2019 | vidyathool@nspcl.co.in monika.godara@nspcl.co.in, rsputtaraju@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003604/CS/OT/03/2019-20 | 15/03/2019 | CS:18196 | COAL SHIFTING FROM DSP BEDS TO NSPCL COAL YARD (PP-II AND PP-III). |
04/04/2019 | 23/04/2019 | 26/04/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2019-20 | 03/04/2019 | CS: 18206 | Biennial Contract for Civil maintenance & Miscellaneous Works for Expansion Power Plant, NSPCL-Bhilai (Yr-2019-21). |
04/04/2019 | 22/04/2019 | 29/04/2019 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2019-20 | 03/04/2019 | CS: 18250 | Replacement of Asbestos Sheet and Fixing of Colour Coated Sheet at Different Areas of PP-II, Pp-III and Township, Nspcl-Bhilai |
04/04/2019 | 22/04/2019 | 29/04/2019 | prabhulinga@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
2018-19 | ||||||||||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/2018-19/11 | 28/03/2019 | 1808134 | Biennial Maintenance Contract for HT/LT Motors & Transformer. |
28/03/2019 | 08/04/2019 | 23/04/2019 | shampa.biswas@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/10/2018-19 | 26/03/2019 | CS: 18190 | Biennial Contract for MGR Track Maintenance works at Expansion Power Plant, NSPCL-Bhilai. |
26/03/2019 | 15/04/2019 | 22/04/2019 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003519/PUR/OT/02/2018-19 | 14/02/2019 | PUR:180174 | Supply of Ground Hopper & Wagon Hopper Gratings. |
05/03/2019 | 16/04/2019 | 19/04/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003518/PUR/OT/02/2018-19 | 14/02/2019 | PUR:180173 | Supply of Coal Burner Nozzle. |
05/03/2019 | 22/03/2019 | 25/03/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/09/2018-19 | 04/03/2019 | CS: 18149 | Biennial Contract for Unloading of coal from wagons placed at Track Hopper and Deployment manpower at CHP of Expansion Power Plant, NSPCL-Bhilai. |
04/04/2019 | 11/04/2019 | 18/04/2019 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/08/2018-19 | 28/02/2019 | CS: 18239B | Biennial Contract for Civil Maintenance & Misc Works for NPSCL Township, Ruabandha & Quarters of BSP Township. |
28/02/2019 | 23/03/2019 | 28/03/2019 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/08/2018-19 | 28/02/2019 | CS: 18239A | Biennial Contract for Horticulture Work for NPSCL Township, Ruabandha. |
28/02/2019 | 23/03/2019 | 28/03/2019 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003372/PUR/OT/01/2018-19 | 01/01/2019 | PUR:180158 | Procurement of PA Fan Rotor Assembly |
11/02/2019 | 02/03/2019 | 06/03/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/18-19/11 | 12/02/2019 | 1809078 | Evacuation of Settled Ash from Lagoons & Disposal at Garjan Quarry for NSPCL, Rourkela. |
15/02/2019 | 15/03/2019 | 29/03/2019 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/CS/ROURKELA/2018-19/10 | 06/02/2019 | 1807099 | Biennial Contract for CHP equipments & Conveyors at NSPCL, Rourkela |
07/02/2019 | 21/02/2019 | 01/03/2019 | shampa.biswas@nspcl.co.in, ak.sahoo@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2018-19 | 24/01/2019 | 1100005838 | Supply & Retrofitting of Numerical Relays for NSPCL-BHILAI PP2 & PP3 |
25/01/2019 | 08/02/2019 | 19/02/2019 | ushakumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/18-19/09 | 18/01/2019 | 1887065 | Procurement of Generator Transformer of 82.5MVA, 11.5KV/132KV for NSPCL Rourkela |
21/01/2019 | 08/03/2019 | 22/03/2019 | ||||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/02/2018-19 | 11/01/2019 | 1100005912 | Supply of Admiralty Brass tubes for 30 MW TG Condenser |
11/01/2019 | 28/01/2019 | 05/02/2019 | bn.goutam@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003373/PUR/OT/11/2018-19 | 01/01/2019 | PUR:180150 | SUPPLY OF ID FAN SHAFT |
08/01/2019 | 26/03/2019 | 29/03/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003288/PUR/OT/10/2018-19 | 15/12/2018 | PUR:180122 | Supply of condenser tube. |
29/12/2018 | 17/01/2019 | 21/12/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003289/PUR/OT/10/2018-19 | 15/12/2018 | PUR:180133 | SUPPLY OF ECONOMISER COIL. |
20/12/2018 | 08/01/2019 | 18/01/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003270/CS/OT/10/2018-19 | 10/12/2018 | CS:18164 | MAINTENANCE CONTRACT FOR DAETP |
20/12/2018 | 20/02/2019 | 22/02/2019 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/18-19/08 | 17/12/2018 | 1885031 | Procurement New Compressor MCC along with supervision & commissioning |
18/12/2018 | 11/02/2019 | 26/02/2019 | ||||||||||||||||||||||||||||||||
NIT | DCB | 2800003153/CS/OT/09/2018-19 | 15/11/2018 | CS:18153 | Development and maintenance of Lawns & Gardens in township |
26/11/2018 | 26/03/2019 | 29/03/2019 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003155/PUR/OT/09/2018-19 | 15/11/2018 | PUR:180116 | Supply of PA Fan Casting. |
27/11/2018 | 12/01/2019 | 16/01/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/2018-19/07 | 24/11/2018 | 1814076 | Biennial Contract for Pressure Parts Maintenance of Both Boilers. |
28/11/2018 | 10/12/2018 | 26/12/2018 | shampa.biswas@nspcl.co.in, ak.sahoo@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/06/2018-19 | 28/11/2018 | CS: 18164 | Transportation of coal from mine end to railway siding & loading in Indian Railway wagons for onward transportation to NSPCL-Bhilai. |
28/11/2018 | 10/12/2018 | 17/12/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/18-19/07 | 10/09/2018 | 1809078 | Water Proof Treatment for Slab Tops to Avoid Leakages/ Dampness in all Civil Structures of both RCC & Steel at NSPCL (2 x 60 MW), Rourkela, Odisha (RLA Study’s Restoration Measures). |
20/11/2018 | 10/12/2018 | 26/12/2018 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2018-19 | 16/11/2018 | CS: 18056 | Refurbishment of CT Cell, Paharpur Make Model No. 1612-05(Sl. No. 79-2-061)D. |
21/12/2018 | 07/01/2019 | 17/01/2019 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003102/PUR/OT/08/2018-19 | 27/10/2018 | PUR:180006R | SUPPLY OF GEARBOX FOR BALL & RACE MILL |
27/10/2018 | 17/11/2018 | 23/11/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003078/CS/OT/08/2018-19 | 13/10/2018 | CS:18138 | AMC OF ASH DISPOSAL LINE. |
27/10/2018 | 25/02/2019 | 27/02/2019 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/05/2018-19 | 24/10/2018 | CS: 18054 | Biennial Contract of Round the Clock Operation & Maintenance of S&T System at Expansion Power Plant, NSPCL-Bhilai (Part A+ Part B). |
25/10/2018 | 12/11/2018 | 22/11/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2018-19 | 10/10/2018 | CS: 18095 | Repair and Rehabilitation of CHP Galleries G1, G2, G3, G4 and Crusher House at PP-II, NSPCL-Bhilai. |
11/10/2018 | 25/10/2018 | 01/11/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2018-19 | 29/01/2019 | CS: 18105 | Construction of slope drain & dowel wall over MGR embankment and construction of labour shed for CHP at NSPCL, Expansion Power Plant. |
30/01/2019 | 14/02/2019 | 21/02/2019 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 05/ 2018 Tender Ref. No.2800002782 | 09/07/2018 | CS/17094R | Supply of various types of Vehicles for Sporadic use |
06/08/2018 | 30/10/2018 | 02/11/2018 | ajoykumar.gupta@nspcl.co.in bk.kundu@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/HR/01 | 16/11/2018 | HR:SHOP | Temporary Allotment Of Shops In The Shopping Complex of NSPCL Bhilai Township. |
16/11/2018 | 26/11/2018 | 03/12/2018 | ushakumari@nspcl.co.in, abdul.waseem@nspcl.co.in, bb.patra@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800003033/PUR/OT/07/2018-19 | 25/09/2018 | PUR:170109 | Thrust & Holding Down Ring Guidance for Ball and Race Mill |
26/09/2018 | 08/01/2019 | 11/01/2019 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2018-19 | 25/09/2018 | CS: 18104 | Painting of Boundary wall, CHP tunnel, Internal & External of misc. buildings at Expansion Power Plant, NSPCL-Bhilai. |
08/10/2018 | 22/10/2018 | 01/11/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2018-19 | 25/09/2018 | CS: 18103 | Internal Painting of Structural Steel work in TG Building at Expansion Power Plant, NSPCL-Bhilai. |
08/10/2018 | 22/10/2018 | 01/11/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/18-19/07 | 10/09/2018 | 1816026 | TRANSPORTATION OF FLY ASH FROM NSPCL SILO & DISPOSAL IN LOW LYING AREA FOR NSPCL,ROURKELA |
12/09/2018 | 03/10/2018 | 15/10/2018 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 04/ 2018 Tender Ref. No.2800002708 | 19/06/2018 | CS/17109R | REPAIRING OF CONCREATE STRUCTURES OF COOLING TOWER 8&9 |
02/07/2018 | 29/09/2018 | 03/10/2018 | ajoykumar.gupta@nspcl.co.in bk.kundu@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 05/ 2018 Tender Ref. No.2800002782 | 09/07/2018 | CS/17094R | Supply of various types of Vehicles for Sporadic use |
06/08/2018 | 29/09/2018 | 03/10/2018 | ajoykumar.gupta@nspcl.co.in bk.kundu@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2018-19 | 29/08/2018 | CS: 18094 | Supply, Erection and commissioning of Fire Detection and alarm system for Main Plant and CHP in PP-II. |
30/08/2018 | 18/09/2018 | 27/09/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2018-19 | 28/08/2018 | 1100005354 | Procurement and Retrofitting of LT ACB for LT Switchgear PP2 & PP3 |
05/10/2018 | 10/10/2018 | 23/10/2018 | ushakumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2018-19 | 28/08/2018 | CS: 18087 | Biennial Rate Contract for maintenance of Wagon Tippler, Side Arm Charger, Radial Stacker & Reclaimer and Associated Systems in CHP, NSPCL Bhilai Expansion Project. |
29/08/2018 | 13/09/2018 | 24/09/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2018-19 | 29/01/2019 | CS: 18049 | Repairing of Ventilation Duct System at different areas of CHP Expansion, NSPCL-Bhilai. |
30/01/2019 | 14/02/2019 | 21/02/2019 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/2018-19/05 | 28/08/2018 | 1814056 | BMC FOR MAINTENANCE OF MILLING SYSTEM AND ROTARY EQUIPMENTS AT NSPCL, ROURKELA. |
29/08/2018 | 13/09/2018 | 05/10/2018 | shampa.biswas@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2018-19 | 25/08/2018 | CS: 18082 | Biennial Civil and Horticulture Maintenance Work at PP-II, NSPCL-Bhilai. |
28/08/2018 | 13/09/2018 | 24/09/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2018-19 | 16/11/2018 | CS: 17236 | External Painting of Chimney of 2x250 MW Expansion Power Plant, NSPCL-Bhilai. |
16/11/2018 | 29/11/2018 | 06/12/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/18-19/05 | 24/08/2018 | 1816026 | Deployment of Excavator at Ash Dyke of NSPCL, Rourkela for Lifting & Loading of Pond Ash in Trucks Mobilized by Agency or as Recommended by NSPCL |
27/08/2018 | 17/09/2018 | 01/10/2018 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002926/CS/OT/06/2018-19 | 13/08/2018 | CS:18116 | AMC OF AC & WATER COOLERS. |
21/08/2018 | 08/11/2018 | 12/11/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002923/CS/OT/06/2018-19 | 11/08/2018 | CS:18105 | Caretaking , Housekeeping and sanitation work at Bachelor hostel, Executive club and ladies club |
21/08/2018 | 14/02/2019 | 15/02/2019 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/CS/ROURKELA/18-19/04 | 13/08/2018 | 1815051 | BMC OF TG & OFFSITE AT NSPCL, ROURKELA |
14/08/2018 | 31/08/2018 | 14/09/2018 | shampa.biswas@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002782/CS/OT/05/2018-19 | 09/07/2018 | CS:17094R | Supply of various types of Vehicles for Sporadic use |
06/08/2018 | 25/08/2018 | 29/08/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002779/CS/OT/05/2018-19 | 09/07/2018 | CS:18073 | HT-LT MOTOR MAINTENANCE |
19/07/2018 | 28/08/2018 | 03/09/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | NIT. NO. NSPCL/ROURKELA/18-19/06 | 27/06/2018 | 1708123 | SUPPLY OF 3X350KVA DG SETS & ITS ACCESSORIES, NEW MCC AND ITS INSTALLATION, COMMISSIONING, ERECTION AND TESTING (TO PROVIDE UNINTERRUPTED EMERGENCY SUPPLY TO PLANT IN CASE OF STATION POWER FAILURE). |
30/07/2018 | 04/09/2018 | 30/11/2018 | shampa.biswas@nspcl.co.in,ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002772/CS/OT/04/2018-19 | 06/07/2018 | CS:18054 | DAETP System Augmentation. |
06/07/2018 | 25/02/2019 | 27/02/2019 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/02/2018-19 | 27/06/2018 | CS: 18045 | Deployment of Hired Vehicles at Various Departments for 08 Hrs. & 24 Hrs. duty at NSPCL-Bhilai. |
02/07/2018 | 23/07/2018 | 30/07/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/02/2018-19 | 27/06/2018 | CS: 17150 | BMC of APH, ESP, Fans, Duct-Dumpers & Overhauling of Fans in 250MW of NSPCL Bhilai Expansion Power Plant(2018-20). |
02/07/2018 | 23/07/2018 | 30/07/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002706/CS/OT/04/2018-19 | 19/06/2018 | CS:18053 | Repairing of concrete structure of DM plant |
02/07/2018 | 29/09/2018 | 05/10/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002736/CS/OT/04/2018-19 | 27/06/2018 | CS:18040 | AMC FOR BOILER & AUX AND OFFSITE |
02/07/2018 | 23/07/2018 | 30/07/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002739/CS/OT/04/2018-19 | 28/06/2018 | CS/RC/18039 | Bi-annual Rate Contract for HT motor Repairing |
02/07/2018 | 23/07/2018 | 01/08/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002708/CS/OT/04/2018-19 | 19/06/2018 | CS:17109R | REPAIRING OF CONCREATE STRUCTURES OF COOLING TOWER 8&9 |
02/07/2018 | 25/08/2018 | 31/08/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2018-19 | 27/06/2018 | CS: 17238 | Biennial Contract of Cold Vulcanizing of Conveyor Belt at PP2 and PP3 at NSPCL-Bhilai. |
27/06/2018 | 06/07/2018 | 16/07/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2018-19 | 27/06/2018 | CS: 17152 | Modification work for extension of CW Pump House Crane support Structure at Expansion Power Plant, NSPCL-Bhilai. |
27/06/2018 | 06/07/2018 | 16/07/2018 | ashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2018-19 | 27/06/2018 | CS: 17154 | Repairing of Road and Fixing of Paver Block at Shoulder of Road at NSPCL Township Bhilai. |
27/06/2018 | 06/07/2018 | 16/07/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2018-19 | 27/06/2018 | CS: 17117 | Repairing/ Resurfacing of approach Roads to PP-II and PP-III at NSPCL-Bhilai. |
27/06/2018 | 06/07/2018 | 16/06/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2018-19 | 08/05/2018 | CS: 18026 | Biennial Contract for Motor maintenance at PP-3 and Motor, transformer and generator cooler maintenance at PP2, NSPCL-Bhilai. |
18/05/2018 | 07/06/2018 | 18/06/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2018-19 | 08/05/2018 | CS: 17238 | Biennial Contract of Cold Vulcanizing of Conveyor Belt at PP2 and PP3 at NSPCL-Bhilai. |
18/05/2018 | 07/06/2018 | 21/06/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2018-19 | 08/05/2018 | CS: 17208 | Biennial Maintenance & Overhaul Contract of Turbine Auxiliaries of PP-III for the year 2018-20. |
18/05/2018 | 07/06/2018 | 18/06/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2018-19 | 08/05/2018 | CS: 17154 | Repairing of Road and Fixing of Paver Block at Shoulder of Road at NSPCL Township Bhilai. |
18/05/2018 | 07/06/2018 | 21/06/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2018-19 | 08/05/2018 | CS : 17152 | Modification work for extension of CW Pump House Crane support Structure at Expansion Power Plant, NSPCL-Bhilai. |
18/05/2018 | 07/06/2018 | 20/06/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2018-19 | 08/05/2018 | CS : 17117 | Repairing/ Resurfacing of approach Roads to PP-II and PP-III at NSPCL-Bhilai. |
18/05/2018 | 07/06/2018 | 20/06/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002568/PUR/OT/03/2018-19 | 30/04/2018 | PUR:180006 | SUPPLY OF GEARBOX FOR BALL & RACE MILL |
16/05/2018 | 15/06/2018 | 18/06/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/18-19/03 | 26/04/2018 | 1845001 | Procurement of Grinding Elements for Coal Mill |
09/05/2018 | 22/06/2018 | 06/07/2018 | ||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/17-18/06 | 16/03/2018 | 1707124 | DEPLOYMENT OF BACK HOE EXCAVATOR/LOADER AT CHP OF NSPCL, ROURKELA. |
09/05/2018 | 30/05/2018 | 15/06/2018 | shampa.biswas@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/17-18/06 | 16/03/2018 | 1714125 | Biennial Maintenance Contract for Coal Firing & Oil Firing System, Ash Handling System, ESP and Ash Brick M/C. |
09/05/2018 | 29/05/2018 | 19/06/2018 | shampa.biswas@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/17-18/05 | 01/12/2017 | 1714050 | Procurement, Erection and Commissioning of 30 T PRDS at NSPCL Rourkela. |
27/06/2018 | 07/07/2018 | 24/08/2018 | shampa.biswas@nspcl.co.in, ak.sahoo@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/ C&M / B-20 / 2018 | 18/01/2018 | B-20 | COOLING WATER AND RAW WATER CHEMICAL TREATMENT . |
18/04/2018 | 17/05/2018 | 22/05/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in, nspcldgp.cm@gmail.com, | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/ C&M / B-10 / 2018 | 18/01/2018 | B-10 | OVERHAULING OF MILLING SYSTEM. |
18/04/2018 | 25/04/2018 | 30/04/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in, nspcldgp.cm@gmail.com, | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/ C&M / B-6 / 2017 | 21/12/2017 | B-6 | Enlistment of Vendor for Overhauling of ID/FD Fans, Ducts / Dampers / Gates for both Units |
18/04/2018 | 25/04/2018 | 30/04/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in, nspcldgp.cm@gmail.com, | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/ C&M / B-2 / 2017 | 21/12/2017 | B-2 | Enlistment of Vendor for Overhauling of ESP . |
15/02/2018 | 25/04/2018 | 30/04/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in, nspcldgp.cm@gmail.com, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002432/PUR/OT/02/2018-19 | 03/03/2018 | PUR:170230 | Procurement of Grinding Element Sets for Ball & Race Mill. |
31/03/2018 | 19/05/2018 | 23/05/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
2017-18 | ||||||||||||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/05/2017-18 | 16/03/2018 | CS: 17215 | Contract for providing services of BACKHOE LOADER and TIPPER/DUMPER in CHP of Expansion Plant |
28/03/2018 | 27/04/2018 | 07/05/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/05/2017-18 | 16/03/2018 | CS: 17191 | BMC of Turbine & Aux., PP-2 (2018-20), NSPCL-BHILAI. |
28/03/2018 | 18/04/2018 | 25/04/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/05/2017-18 | 16/03/2018 | CS: 17190 | External Painting of Residential and Non-Residential building at NSPCL Township, Bhilai. |
28/03/2018 | 18/04/2018 | 30/04/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/05/2017-18 | 16/03/2018 | CS: 17189 | Biennial maintenance contract of CHP equipment’s at PP-II & PP-III, NSPCL-Bhilai. |
28/03/2018 | 18/04/2018 | 30/04/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/05/2017-18 | 16/03/2018 | CS : 17123R | Annual Contract for unloading of coal from wagons placed at Track Hopper and supply of manpower at CHP of Expansion Power Plant, NSPCL-Bhilai. |
26/03/2018 | 16/04/2018 | 23/04/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/ C&M / B-25/ 2018 | 08/03/2018 | B-25 | AMC for Electrical Hoist/H.T. EOT Crane |
08/03/2018 | 10/04/2018 | 14/04/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, nspcldgp.cm@gmail.com, | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/ C&M / B-8/ 2018 | 08/03/2018 | B-8 | AMC of Ash Disposal Line for NSPCL, Durgapur |
08/03/2018 | 17/05/2018 | 22/05/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, nspcldgp.cm@gmail.com, | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 01/ 2018 Tender Ref. No.2800002338 | 02/02/2018 | CS/17156 | RLA STUDY OF BOILER, TURBINE AND GENERATOR FOR U#2 |
10/02/2018 | 24/03/2018 | 30/03/2018 | ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | CC/C M/C-507 | 09/03/2018 | CC/C M/C-507 | R&M Work of coal conveying system from intermediate storage area near JH#C1C at Bhilai PP-II (2X30 MW + 14 MW) |
12/04/2018 | 03/05/2018 | 19/06/2018 | vidyathool@nspcl.co.inmonika.godara@nspcl.co.in, rpahirwar@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/ C&M / B-6 / 2017 | 21/12/2017 | B-6 | Enlistment of Vendor for Overhauling of ID/FD Fans, Ducts / Dampers / Gates for both Units |
05/03/2018 | 17/03/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, nspcldgp.cm@gmail.com | ||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/ C&M / B-2 / 2017 | 21/12/2017 | B-2 | Enlistment of Vendor for Overhauling of ESP . |
05/03/2018 | 17/03/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, nspcldgp.cm@gmail.com | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 07 / 2017 Tender Ref. No.2800002208 | 25/12/2017 | CS/17120 | Cooling Water & Raw Water Treatment |
06/01/2018 | 06/02/2018 | 21/02/2018 | ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/ C&M / B-20/ 2018 | 18/01/2018 | B-20 | COOLING WATER AND RAW WATER CHEMICAL TREATMENT |
18/01/2018 | 10/03/2018 | 17/03/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, nspcldgp.cm@gmail.com, | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/ C&M / B-10/ 2018 | 18/01/2018 | B-10 | OVERHAULING OF MILLING SYSTEM |
18/01/2018 | 10/03/2018 | 17/03/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in, nspcldgp.cm@gmail.com, | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002339/CS/OT/01/2018-19 | 02/02/2018 | CS:17157 | OVERHAULING OF ID & FD FANS ,DUCTS,DAMPERS AND ESP |
10/02/2018 | 27/02/2018 | 05/03/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002338/CS/OT/01/2018-19 | 02/02/2018 | CS:17156 | RLA STUDY OF BOILER, TURBINE AND GENERATOR FOR U#2 |
10/02/2018 | 27/02/2018 | 09/03/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002336/CS/OT/01/2018-19 | 02/02/2018 | CS:17155 | OH OF PRESSURE PART AND ROTARY AIR PRE-HEATER |
10/02/2018 | 27/02/2018 | 05/02/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2017-18 | 04/01/2018 | 1100004198 | ABT SYSTEM FOR NSPCL BHILAI-PP3 |
01/02/2018 | 21/02/2018 | 09/03/2018 | ushakumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2017-18 | 04/01/2018 | CS : 17128 | Brick Paving work in misc. areas of PP-III (Year 2017-18). |
01/03/2018 | 21/03/2018 | 02/04/2018 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 07 / 2017 Tender Ref. No.2800002208 | 25/12/2017 | CS/17120 | Cooling Water & Raw Water Treatment |
06/01/2018 | 06/02/2018 | 12/02/2018 | ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 06 / 2017 Tender Ref. No.2800002106 | 24/11/2017 | PUR/170137 | Supply of ID Fan Shaft |
17/01/2018 | ajoykumar.gupta@nspcl.co.in bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 06 / 2017 Tender Ref. No.2800002105 | 24/11/2017 | PUR/170109 | Thrust & Holding Down Ring Guidance for Ball and Race Mill |
04/12/2017 | 25/01/2018 | 31/01/2018 | ajoykumar.gupta@nspcl.co.in bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 06 / 2017 Tender Ref. No.2800002130 | 02/12/2017 | CS/17122 | Supply Erection, Testing & Commissioning of LT ACB |
19/01/2018 | ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||||
NIT | DCB | 2800002208/CS/OT/07/2017-18 | 25/12/2017 | CS:17120 | Cooling Water & Raw Water Treatment |
06/01/2018 | 20/01/2018 | 31/01/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002210/CS/OT/07/2017-18 | 25/12/2017 | CS:17109 | REPAIRING OF CONCREATE STRUCTURES OF COOLING TOWER 8 & 9 |
06/01/2018 | 20/01/2018 | 02/02/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/17-18/04 -1634322 | 16/10/2017 | 1634322 | Procurement of Refrigerant Type Hydrogen Dryer for Generator |
31/10/2017 | 20/01/2018 | 09/02/2018 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/05 | 01/12/2017 | 1685194 | Purchase of Ash Slurry augmentation MCC |
20/12/2017 | 14/02/2018 | 02/03/2018 | ||||||||||||||||||||||||||||||||
NIT | DCB | CC/C M/C-497 | 19/12/2017 | CC/C M/C-497 | Renovation & Retrofitting work of ESP up-gradation at Bhilai PP-II (2X30MW+14MW) |
02/02/2018 | 23/02/2018 | 08/05/2018 | monika.godara@nspcl.co.in, vidyathool@nspcl.co.in, rpahirwar@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIEA | Application | Corrigendum- 1 | 11/12/2017 | B-17 | Vendor Enlistment for Maintenance of LT/HT Motors |
04/12/2017 | 30/12/2017 | 10/01/2018 | ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/17-18/04 -1634322 | 16/10/2017 | 1634322 | Procurement of Refrigerant Type Hydrogen Dryer for Generator |
31/10/2017 | 20/12/2017 | 05/01/2018 | ||||||||||||||||||||||||||||||||
NIT | DCB | 2800002106/PUR/OT/06/2017-18 | 24/11/2017 | PUR:170137 | Supply of ID Fan Shaft |
04/12/2017 | 20/12/2017 | 03/01/2018 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002105/PUR/OT/06/2017-18 | 24/11/2017 | PUR:170109 | Thrust & Holding Down Ring Guidance for Ball and Race Mill |
26/09/2017 | 17/11/2017 | 21/11/2017 | ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002107/CS/OT/06/2017-18 | 24/11/2017 | CS:17123 | Township Electrical Maintenance |
04/12/2017 | 20/12/2017 | 27/12/2017 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002130/CS/OT/06/2017-18 | 02/12/2017 | CS:17122 | Supply Erection, Testing & Commissioning of LT ACB |
04/12/2017 | 20/12/2017 | 03/01/2018 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002109/CS/OT/06/2017-18 | 24/11/2017 | CS:17121 | AMC OF Ash Disposal Line |
04/12/2017 | 20/12/2017 | 29/12/2017 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800002107/CS/OT/06/2017-18 | 24/11/2017 | CS:17119 | PAINTING IN BOILER & OFFSITE AREA |
04/12/2017 | 20/12/2017 | 27/12/2017 | ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/04 | 16/10/2017 | 1749082 | Procurement of Cooler for Generator & Boiler Feed Pump Motor |
31/10/2017 | 05/12/2017 | 22/12/2017 | ||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/17-18/04 -1634322 | 16/10/2017 | 1634322 | Procurement of Refrigerant Type Hydrogen Dryer for Generator |
31/10/2017 | 05/12/2017 | 22/12/2017 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 05/ 2017 Tender Ref. No.2800001978 | 26/09/2017 | CS/17093 | Maintenance Contract for DAETP. |
28/10/2017 | 05/12/2017 | 11/12/2017 | ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 05/ 2017 Tender Ref. No.2800001980 | 28/09/2017 | CS/17094 | Supply of various types of Vehicles for Sporadic use |
28/10/2017 | 02/12/2017 | 11/12/2017 | ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/17-18/03-1720032 | 28/08/2017 | 1720032 | Procurement of Gear Box for Coal Mill- MKM 33J |
28/08/2017 | 14/11/2017 | 05/12/2017 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/04 | 16/10/2017 | 1749082 | Procurement of Hydrogen Gas Cooler for Generator and Boiler Feed Pump Motor |
31/10/2017 | 20/11/2017 | 08/12/2017 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/04 | 16/10/2017 | 1634322 | Procurement of Refrigerant type Hydrogen Dryer for Generator |
31/10/2017 | 20/11/2017 | 08/12/2017 | ||||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2017-18 | 18/10/2017 | CS : 17123 | Annual Contract for unloading of coal from wagons placed at Track Hopper and supply of manpower at CHP of Expansion Power Plant, NSPCL-Bhilai. |
06/11/2017 | 25/11/2017 | 07/12/2017 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2017-18 | 18/10/2017 | CS : 17114 | Repair and Strengthening of Cooling Tower and DM Plant clarifiers, Power Plant-II, NSPCL-Bhilai. |
06/11/2017 | 25/11/2017 | 07/12/2017 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800001980/CS/OT/05/2017 | 26/09/2017 | CS:17094 | Supply of various types of Vehicles for Sporadic use |
28/10/2017 | 18/11/2017 | 27/11/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800001978/CS/OT/05/2017 | 26/09/2017 | CS:17093 | Maintenance Contract for DAETP. |
28/10/2017 | 18/11/2017 | 24/11/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800001764 | 20/06/2017 | CS/17064 | Development and Maintenance of Lawns & Gardens |
25/10/2017 | 30/10/2017 | 03/11/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
Corrigendum to NIT | DCB | NSPCL/ROURKELA/17-18/03 | 28/08/2017 | NSPCL/RKL/C M/2017-18/Vender Enlistment/Civil | Enlistment of Vendors for various Civil Works at NSPCL(2 X 60MW) ,Rourkela,Odisha (For Packages-3 & 6 only) |
05/09/2017 | 05/10/2017 | 07/11/2017 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | CC/C M/C-496 | 12/10/2017 | CC/C M/C-496 | EPC Package for Kulti Solar PV Power Project (25MWp) at Kulti, West Bengal |
23/10/2017 | 23/11/2017 | 23/01/2018 | monika.godara@nspcl.co.in, vidyathool@nspcl.co.in, rpahirwar@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/17-18/03 -1720032 | 28/08/2017 | NSPCL/ROURKELA/17-18/03 -1720032 | Procurement of Gear Box for Coal Mill- MKM 33 J |
28/08/2017 | 16/10/2017 | 07/11/2017 | ||||||||||||||||||||||||||||||||
NIT | DCB | CC/C M/C-495 | 04/10/2017 | CC/C M/C-495 | EPC Package for Bhilai Solar PV Power Project (7MWp) at Bhilai, Chhattisgarh |
14/10/2017 | 13/11/2017 | 22/01/2018 | monika.godara@nspcl.co.in, vidyathool@nspcl.co.in, rpahirwar@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2017 Tender Ref. No.2800001764 | 28/07/2017 | CS/17064 | Development & Maintenance of Lawns & Garden |
31/07/2017 | 11/10/2017 | 18/10/2017 | ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/03 | 28/08/2017 | 1720032 | Procurement of Gear Box for Coal Mill- MKM 33 J |
11/09/2017 | 30/09/2017 | 24/10/2017 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/02 | 01/07/2017 | 1681182 | Procurement of Cable Tray for Ash Plant Augmentation |
25/07/2017 | 16/08/2017 | 05/09/2017 | ||||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/03 | 28/08/2017 | NSPCL/RKL/C&M/2017-18/Vender Enlistment/Civil | Enlistment of Vendors for various Civil Works at NSPCL (2 X 60MW) ,Rourkela,Odisha |
05/09/2017 | 05/10/2017 | 19/10/2017 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/02/2017-18 | 30/08/2017 | CS : 17060 | Quality Management of Steam Water & Operation of Water Treatment Plants, Expansion Power Plant, NSPCL-Bhilai. |
05/09/2017 | 25/09/2017 | 09/10/2017 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/02/2017-18 | 30/08/2017 | CS : 17059 | Monitoring & Management of Water Quality, O&M of WCTP and other services at Power Plant-II, NSPCL-Bhilai. |
05/09/2017 | 25/09/2017 | 05/10/2017 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2017 Tender Ref. No.2800001746 | 22/07/2017 | CS/17038 | Shifting of Coal from DSP Coal bed to NSPCL Coal yard |
ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | ||||||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 03 / 2017 Tender Ref. No.2800001697 | 04/07/2017 | PUR/170036 | PA FAN ROTOR ASSEMBLY |
08/07/2017 | 24/08/2017 | 28/08/2017 | ajoykumar.gupta@nspcl.co.in bk.kundu@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | 2800001764/CS/OT/04/2017-18 | 28/08/2017 | CS:17064 | Development& Maintenance of Lawns & Gardens |
31/07/2017 | 19/08/2017 | 28/08/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800001717/CS/OT/04/2017-18 | 25/08/2017 | CS:17061 | Overhauling of Milling System. |
31/07/2017 | 19/08/2017 | 25/08/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800001746/CS/OT/04/2017-18 | 20/08/2017 | CS:17038 | Shifting of Coal from DSP Coal bed to NSPCL Coal yard |
31/07/2017 | 19/08/2017 | 28/08/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT/NSPCL/DGP/ C&M / OT/e-Tender / 03 / 2017 Tender Ref. No.2800001696 | 01/07/2017 | CS/17029 | Rewinding & Repairing of 200KW,6.6KV Mill Motors |
08/07/2017 | 11/08/2017 | 18/08/2017 | ajoykumar.gupta@nspcl.co.in c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800001764/CS/OT/04/2017-18 | 28/08/2017 | CS:17064 | Development& Maintenance of Lawns & Gardens |
31/07/2017 | 19/08/2017 | 28/08/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800001746/CS/OT/04/2017-18 | 28/08/2017 | CS:17038 | Shifting of Coal from DSP Coal bed to NSPCL Coal yard |
31/07/2017 | 19/08/2017 | 28/08/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800001717/CS/OT/04/2017-18 | 28/08/2017 | CS:17061 | Overhauling of Milling System. |
31/07/2017 | 19/08/2017 | 25/08/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/02 | 01/07/2017 | 1681182 | Procurement of Cable Tray for Ash Plant Augmentation |
25/07/2017 | 16/08/2017 | 05/09/2017 | ||||||||||||||||||||||||||||||||
NIT | DCB | 2800001697/PUR/OT/03/2017-18 | 07/08/2017 | PUR: 170036 | Procurement of PA Fan Rotor Assembly |
08/07/2017 | 31/07/2017 | 07/08/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, bk.kundu@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/02 | 08/07/2017 | 1709016 | Restoration measured for Foundations & other allied Civil Structures of both RCC & Steel at NSPCL(2 X 60 MW),Rourkela |
10/07/2017 | 25/07/2017 | 16/08/2017 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/02 | 08/07/2017 | 1709024 | Evacuation of Settled Ash from Lagoons & Disposal at Garjan Quarry for NSPCL, Rourkela |
10/07/2017 | 25/07/2017 | 16/08/2017 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 2800001416/CS/OT/02/2017-18 | 03/04/2017 | CS : 16248 | Pond Ash Evacuation and Transportation at different Location of NH-2 road expansion |
03/04/2017 | 19/06/2017 | 23/06/2017 | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/17-18/01/Sl-03 | 05/06/2017 | 1708004/2800001520 | BIENNIAL MISCELLANEOUS CONTRACT OF ELECTRICAL MAINTENANCE. |
09/05/2017 | 12/06/2017 | 23/06/2017 | shantanuacharya@ntpc.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | CC/C&M/C-479 | 26/05/2017 | CC/C&M/C-479 | EPC Package for Salem Solar PV Power Project (50 MWp) at Salem, Tamilnadu |
12/06/2017 | 12/07/2017 | 30/03/2018 | monika.godara@nspcl.co.in, vidyathool@nspcl.co.in, rpahirwar@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | ICB | NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 02 / 2017 | /03.04.2017/ | CS/ 16248 | Pond Ash Evacuation and Transportation at different Location of NH-2 road expansion | /19.05.2017/ | /01.06.2017/ | /09.06.2017/ | nspcldgp.cm@gmail.com, ajoykumar.gupta@nspcl.co.in, c.bhattacharjee@nspcl.co.in. | |||||||||||||||||||||||||||||||
NIT | DCB | CC/C&M/C-475 | 17/05/2017 | CC/C&M/C-475 | EPC Package for Durgapur Solar PV Power Project (20 MWp) at Durgapur, West Bengal |
29/05/2017 | 29/06/2017 | 28/07/2017 | rajendra.singh@nspcl.co.in, vidyathool@nspcl.co.in, rpahirwar@nspcl.co.in, | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2017-18 | /29.04.2017/ | CS : 16228 | Biennial Contract for Horticulture Maintenance at Expansion Power Plant for FY: 17-18 & 18-19. | /12.05.2017/ | /01.06.2017/ | /15.06.2017/ | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/01/ Sl-03 | 21/04/2017 | 1708004 / 2800001520 | Biennial Miscellaneous Contract of Electrical Maintenance |
09/05/2017 | 30/05/2017 | 16/06/2017 | sc.tripathy@nspcl.co.in, nsen.sharma@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/01 | 21/04/2017 | 1616184 | Deployment of Excavator at Ash Dyke NSPCL, Rourkela for Lifting & Loading of Pond Ash in Trucks Mobilized by agency or as recommended by NSPCL |
29/04/2017 | 20/05/2017 | 27/05/2017 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/17-18/01 | 10/04/2017 | 1645275 | Procurement of Grinding Elements for Coal Mill |
29/04/2017 | 22/06/2017 | 06/07/2017 | ||||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/01/2017-18 | 29/04/2017 | CS : 16228 | Biennial Contract for Horticulture Maintenance at Expansion Power Plant for FY: 17-18 & 18-19. |
08/05/2017 | 25/05/2017 | 08/06/2017 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 02 / 2017 | 03/04/2017 | CS/ 16248 | Pond Ash Evacuation and Transportation at different Location of NH-2 road expansion |
19/05/2017 | |||||||||||||||||||||||||||||||||||
2016-17 | ||||||||||||||||||||||||||||||||||||||||
NIT | ICB | NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 01 / 2017 | 21/02/2017 | CS/ 16217 , CS/ 16218 , CS/ 16219 |
|
21/02/2017 | 13/04/2017 | 17/04/2017 | ||||||||||||||||||||||||||||||||
NIT | ICB | NIT.NO.NSPCL/ROURKELA/16-17/08 | 28/02/2017 | 1608034/ RFX No 2800001311 | (i) Overhauling of GT, ST & UAT at NSPCL Rourkela . (ii) Deployment of Back Hoe Excavator |
07/03/2017 | 27/03/2017 | 11/04/2017 | sc.tripathy@nspcl.co.in siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/16-17/08/ Sl-05 | 28/02/2017 | 1614157 / 2800001362 | Biennial Maintenance Contract of DAETP for NSPCL Rourkela. |
16/03/2017 | 05/04/2017 | 21/04/2017 | sc.tripathy@nspcl.co.in, nsen.sharma@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/16-17/08 | 28/02/2017 | 1609115 | Biennial Plant Civil Maintenance work in NSPCL, Rourkela (2017-19). |
07/03/2017 | 27/03/2017 | 14/04/2017 | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/16-17/08/ Sl-01 | 28/02/2017 | 1608034 / 2800001311 | Overhauling of GT, ST & UAT at NSPCL Rourkela. |
07/03/2017 | 27/03/2017 | 11/04/2017 | sc.tripathy@nspcl.co.in, nsen.sharma@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/16-17/08/ Sl-02 | 28/02/2017 | 1607145 / 2800001313 | Deployment of back HOE Exavator |
07/03/2017 | 27/03/2017 | 03/04/2017 | sc.tripathy@nspcl.co.in, nsen.sharma@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/16-17/08 | 28/02/2017 | 1533236 | Procurement of Ash Slurry & Drain Pit Pumps complete assembly along with motor |
16/03/2017 | 05/04/2017 | 05/04/2017 | ||||||||||||||||||||||||||||||||
NIT | ICB | 2800001293 | 03/03/2017 | Pur/160175 | NTPC-SAIL Power Company Pvt. Ltd., Durgapur |
03/03/2017 | 20/03/2017 | 27/03/2017 | ajoykumar.gupta@nspcl.co.in nspcldgp.cm@gmail.com | |||||||||||||||||||||||||||||||
NIT | ICB | 2800001297 | 03/03/2017 | CS/16219 | NTPC-SAIL Power Company Pvt. Ltd., Durgapur |
03/03/2017 | 20/03/2017 | 24/03/2017 | ajoykumar.gupta@nspcl.co.in nspcldgp.cm@gmail.com | |||||||||||||||||||||||||||||||
NIT | ICB | 2800001296 | 03/03/2017 | CS/16218 |
NTPC-SAIL Power Company Pvt. Ltd., Durgapur |
03/03/2017 | 20/03/2017 | 24/03/2017 | ajoykumar.gupta@nspcl.co.in nspcldgp.cm@gmail.com | |||||||||||||||||||||||||||||||
NIT | ICB | 2800001295 | 03/03/2017 | CS/16217 | NTPC-SAIL Power Company Pvt. Ltd., Durgapur |
03/03/2017 | 20/03/2017 | 24/03/2017 | ajoykumar.gupta@nspcl.co.in nspcldgp.cm@gmail.com | |||||||||||||||||||||||||||||||
NIT | ICB | 2800001294 | 03/03/2017 | CS/16216 | NTPC-SAIL Power Company Pvt. Ltd., Durgapur |
03/03/2017 | 20/03/2017 | 24/03/2017 | ajoykumar.gupta@nspcl.co.in nspcldgp.cm@gmail.com | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/05/2016-17 | 03/03/2017 | CS : 16199 | Biennial Contract for Stone Picking from Running Conveyors in CHP PP-2, NSPCL-Bhilai. |
09/03/2017 | 30/03/2017 | 10/04/2017 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2016 | 20/12/2016 | PUR / 160137 | Procurement of Grinding Rings & Grinding Balls for Ball and Race Mill |
11/03/2017 | 17/03/2017 | ||||||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2016-17 | 23/12/2016 | 1100003329 | Supply & retrofitting of 11.5KV vacuum circuit breakers for Generator at PP-2. |
14/01/2017 | 11/02/2017 | 07/03/2017 | gsmandloi@nspcl.co.in, shipiarya@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2016-17 | 23/12/2016 | CS : 16165 | Construction of 10 nos. of classroom in Govt. School, Gughwa Village under CSR activities at NSPCL-Bhilai. |
04/01/2017 | 22/02/2017 | 02/03/2017 | rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | ICB | NIT.NO.NSPCL/ROURKELA/16-17/07 | /25.01.17/ | 1608104/ RFX No 2800001099 | Biennial maintenance contract for HT/LT Motor and Transformer Supply & Installation of earth pit in NSPCL Quarters at RSP Township |
/19.01.17/ | /29.01.17/ | /03.02.2017/ | sc.tripathy@nspcl.co.in siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2016-17 | 23/12/2016 | 1100003329 | Supply & retrofitting of 11.5KV vacuum circuit breakers for Generator at PP-2 |
14/01/2017 | 05/02/2017 | 28/02/2017 | gsmandloi@nspcl.co.in, shipiarya@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2016-17 | 23/12/2016 | CS : 16165 | Construction of 10 nos. of classroom in Govt. School, Gughwa Village under CSR activities at NSPCL-Bhilai. |
04/01/2017 | 25/01/2017 | 06/02/2017 | Rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2016-17 | 23/12/2016 | CS : 16155 | Biennial Maintenance Contract for Main Equipments and Systems of CHP of Exp. Plant of NSPCL-Bhilai. |
04/01/2017 | 25/01/2017 | 06/02/2017 | Rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2016-17 | 23/12/2016 | CS : 16129 | Annual Contract for unloading of coal from wagons placed at Track Hopper and supply of manpower at CHP of Expansion Power Plant, NSPCL-Bhilai. |
04/01/2017 | 25/01/2017 | 02/02/2017 | Rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/04/2016-17 | 23/12/2016 | CS : 16053 | Round the Clock Electrical shift maintenance for NSPCL PP-3. |
04/01/2017 | 25/01/2017 | 02/02/2017 | Rashmikumari@nspcl.co.in, monikasagar@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ Rourkela/16-17/07/Sl No-3 | 21/12/2016 | 1608105 | Supply & Installation of earth pit in NSPCL Quarters at RSP Township
|
29/12/2016 | 19/01/2017 | 03/02/2017 | sc.tripathy@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ Rourkela/16-17/07/Sl No-2 | 21/12/2016 | 1608104/ 2800001099 | Biennial Maintenance contract for HT/ LT Motor and Transformer |
29/12/2016 | 19/01/2017 | 03/02/2017 | sc.tripathy@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/16-17/07/ Sl-01 | 21/12/2016 | 1614062/ 2800001122 | Annual Maintenance Contract for Coal and Oil Firing System, Ash Handling System, ESP and Ash Brick machine . |
29/12/2016 | 19/01/2017 | 03/02/2017 | sc.tripathy@nspcl.co.in | |||||||||||||||||||||||||||||||
NIT | DCB | NIT.NO.NSPCL/ROURKELA/16-17/07/ Sl-03 | 21/12/2016 | 1608105 / 2800001149 | NSPCL, Rourkela invites online Tender |
29/12/2016 | 19/01/2017 | 03/02/2017 | sc.tripathy@nspcl.co.in | |||||||||||||||||||||||||||||||
NTPC-SAIL Power Company Pvt. Ltd., Durgapur | /21.01.2017/ | nspcldgp.cm@gmail.com | ||||||||||||||||||||||||||||||||||||||
NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2016 Tender Ref. No. 2800001139 | NTPC-SAIL Power Company Pvt. Ltd., Durgapur | /21.01.2017/ | nspcldgp.cm@gmail.com | |||||||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/16-17/06 | /04.11.16/ | 1622029 | Development of areas near Construction Office at NSPCL, Rourkela | /25.11.16/ | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/16-17/06 | /04.11.16/ | 1622075 | Renovation of B-29 & B-34 Sector-03 into NSPCL Field Hostel-Transit Accommodation | /25.11.16/ | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/16-17/06 | /04.11.16/ | 1509154 | Augmentation of Existing Ash Slurry System, | /25.11.16/ | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||||
Corrigendum-I | DCB | NSPCL/DGP/C&M/OT/e-Tender/03/2016 | /04.11.16/ | CS/16123 | Repair and Painting of External Surface of RCC Chimney at NSPCL, Durgapur | /16.11.16/ | ajoykumar.gupta@nspcl.co.in | |||||||||||||||||||||||||||||||||
Corrigendum-II | DCB | NSPCL/ROURKELA/16-17/06 | /16.12.16/ | 1614070 | Biennial Contract for Pressure Parts Maintenance | /27.12.16/ | /24.12.16/ | siladri.moharana@nspcl.co.in | ||||||||||||||||||||||||||||||||
Corrigendum-I | DCB | NSPCL/ROURKELA/16-17/06 | /26.11.16/ | 1614070 | Biennial Contract for Pressure Parts Maintenance. | /09.12.16/ | /08.12.16/ | siladri.moharana@nspcl.co.in | ||||||||||||||||||||||||||||||||
Corrigendum-I | DCB | NSPCL/ROURKELA/16-17/06 | /26.11.16/ | 1603052 | Transportation of material from all over India to NSPCL, Rourkela & Vice Versa | /09.12.16/ | /16.12.16/ | siladri.moharana@nspcl.co.in | ||||||||||||||||||||||||||||||||
NIT | DCB | 0230/CS/OT/03/2016-17 | /16.08.16/ | CS/16082 | Two years operation and maintenance contract of AC system PP-III | /13.10.16/ | ||||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/C&M /OT/e-Tender/03/2016 | /05.09.16/ | CS/16123 | Repair and Painting of External Surface of RCC Chimney at NSPCL, Durgapur | /21.10.16/ | ajoykumar.gupta@nspcl.co.in | |||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/C&M/OT/e-Tender/03/2016 | /05.09.16/ | CS/16115 | AMC of Ash Disposal Line | /21.10.16/ | ajoykumar.gupta@nspcl.co.in | |||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/DGP/C&M/OT/e-Tende /03/2016 | /05.09.16/ | CS/16109 | Maintenance Contract for DAETP | /21.10.16/ | ajoykumar.gupta@nspcl.co.in | |||||||||||||||||||||||||||||||||
|
NIT | DCB | NSPCL/ROURKELA/16-17/06 | /04.11.16/ | 1614070 | Biennial Contract for Pressure Parts Maintenance | /25.11.16/ | siladri.moharana@nspcl.co.in | ||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/16-17/06 | /04.11.16/ | 1603052 | Transportation of Materials from all over India to NSPCL & ViceVersa for NSPCL, Rourkela | /25.11.16/ | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/16-17/06 | /04.11.16/ | 1609094 | Construction of Dining Hall at Kalpataru-Rourkela &Dining & Kitchen Room-Lathikata & Civil Works at VaishnodeviMandir-Rourkela under CSR Activities for NSPCL,Rourkela | /25.11.16/ | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/16-17/06 | /04.11.16/ | 1609093 | Construction of Class Rooms(Sec-02-Rourkela & Lathikata) & Laboratory at Sector-20,Rourkela under CSR Activities at NSPCL,Rourkela | /25.11.16/ | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/16-17/06 | /04.11.16/ | 1609091 | Construction of Toilet Blocks & Passenger Shed(Bus Stop) at various locations in Rourkela under CSR Activities | /25.11.16/ | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||||
NIT | DCB | NSPCL/ROURKELA/16-17/06 | /04.11.16/ | 1609092 | Construction of Class Room (02 nos) & Boundary Wall in Garjan Village under CSR Activities for NSPCL, Rourkela | /25.11.16/ | siladri.moharana@nspcl.co.in | |||||||||||||||||||||||||||||||||
1614062 / 2800001122 | DOMESTIC COMPETITIVE BIDDING |
29/12/2016 | 19/01/2017 | 03/02/2017 | ||||||||||||||||||||||||||||||||||||
1608104 / 2800001099 | DOMESTIC COMPETITIVE BIDDING |
03/02/2017 | ||||||||||||||||||||||||||||||||||||||
413-1509154- Detailed NIT -NIT-6 Sl no 01
|
NIT | DCB | NSPCL/ROURKELA/16-17/06 | /04.11.16/ | 1509154 | Rourkela | /25.11.16/ | siladri.moharana@nspcl.co.in | ||||||||||||||||||||||||||||||||
DOMESTIC COMPETITIVE BIDDING | 04/11/2016 | 25/11/2016 | ||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/16-17/06 | Tender No 1614070 | Biennial Contract for Pressure Parts Maintenance. | 04/11/2016 | 25/11/2016 | 09/12/2016 | |||||||||||||||||||||||||||||||||||
1614070/RFX No 2800000966 | Biennial Contract for Pressure Parts Maintenance. | 13/12/2016 | 27/12/2016 | |||||||||||||||||||||||||||||||||||||
DOMESTIC COMPETITIVE BIDDING |
||||||||||||||||||||||||||||||||||||||||
1. NSPCL,Transportation of material from all over India to NSPCL Rourkela & Vice Versa 2. Biennial Contract for Pressure Parts Maintenance. |
||||||||||||||||||||||||||||||||||||||||
(i) Tender No 1614070- Biennial Contract for Pressure Parts Maintenance. (ii) Tender No- 1603052 -Transportation of materials from all over India to NSPCL & vice versa. |
||||||||||||||||||||||||||||||||||||||||
Corrigendum of NIEA ( AMC of C&I Works ) |
||||||||||||||||||||||||||||||||||||||||
Renovation of B-29 & B-34 Sector-03 into NSPCL Field Hostel/ Transit Accommodation |
||||||||||||||||||||||||||||||||||||||||
Development of areas near Construction Office at NSPCL, Rourkela |
||||||||||||||||||||||||||||||||||||||||
(Package-D)Construction of Dining Hall at Kalpataru-Rourkela & Dining & Kitchen Room-Lathikata & Civil Works at Vaishnodevi Mand |
||||||||||||||||||||||||||||||||||||||||
(Package-C) Construction of Class Rooms(Sec-02-Rourkela & Lathikata) & Laboratory at Sector-20,Rourkela under CSR Activities a |
||||||||||||||||||||||||||||||||||||||||
(Package-B) Construction of Toilet Blocks & Passenger Shed(Bus Stop) at various locations in Rourkela under CSR Activities |
||||||||||||||||||||||||||||||||||||||||
(Package-A) Construction of Class Room (02 |
||||||||||||||||||||||||||||||||||||||||
Transportation of Materials from all over India |
||||||||||||||||||||||||||||||||||||||||
Augmentation of Existing Ash Slurry System at NSPCL, Rourkela |
||||||||||||||||||||||||||||||||||||||||
Biennial Contract for Pressure Parts Maintenance. |
||||||||||||||||||||||||||||||||||||||||
Repair and Painting of External Surface of RCC Chimney at NSPCL, Durgapur |
||||||||||||||||||||||||||||||||||||||||
Removal and relaying of slurry disposal pipe lines and miscellaneous mechanical jobs in Boi |
||||||||||||||||||||||||||||||||||||||||
Hiring of Vehicles for different Departments |
||||||||||||||||||||||||||||||||||||||||
Expression of Interest for sale of Ash |
||||||||||||||||||||||||||||||||||||||||
Biennial Ash Dyke Maintenance (2017 & 2018) at NSPCL,Rourkela |
||||||||||||||||||||||||||||||||||||||||
Painting of Plant Building,Boundary Wall of Plant & Brick Paving for Plant Beautification inside CPP-II,NSPCL,Rourkela |
||||||||||||||||||||||||||||||||||||||||
Structural Painting of TG Hall Building inside CPP-II,NSPCL, Rourkela |
||||||||||||||||||||||||||||||||||||||||
Fencing of Construction Areas of Expansion Project(IX250MW at NSPCL,Rourkela) |
||||||||||||||||||||||||||||||||||||||||
Renovation of Quarters for Bachelor Accomodation at NSPCL,Rourkela |
||||||||||||||||||||||||||||||||||||||||
DOMESTIC COMPETITIVE BIDDING |
||||||||||||||||||||||||||||||||||||||||
DOMESTIC COMPETITIVE BIDDING |
||||||||||||||||||||||||||||||||||||||||
NOTICE INVITING ENLISTMENT APPLICATION ( NIEA) |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/16-17/03 |
||||||||||||||||||||||||||||||||||||||||
DOMESTIC COMPETITIVE BIDDING |
||||||||||||||||||||||||||||||||||||||||
OT ET 03-2016 CS16115 NTPC |
||||||||||||||||||||||||||||||||||||||||
OT ET 03-2016 CS16109 NTPC |
||||||||||||||||||||||||||||||||||||||||
OT ET 03 2016 CS 16123 |
||||||||||||||||||||||||||||||||||||||||
Procurement of grinding elements for coal Mill |
||||||||||||||||||||||||||||||||||||||||
BMC for Maintenance of Milling System and Rotary Equipments. |
||||||||||||||||||||||||||||||||||||||||
BMC of TG and Offsite |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/16-17/02 |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/16-17/02 |
||||||||||||||||||||||||||||||||||||||||
NIT and QR OT ET 02 2016 CS16068 |
||||||||||||||||||||||||||||||||||||||||
1. Ref. No. NSPCL/DGP/C&M/A4/2016 Dated 25.05.2016 - Annual Maintenance Contract for Ash Disposal Line - Pkg. No. B26 2. Ref. No. NSPCL/DGP/C&M/A5/2016 Dated 21.06.2016 - Disposal of Pond Ashfrom Ash Dyke of NSPCL-Durgapur - Pkg.No. B27 |
||||||||||||||||||||||||||||||||||||||||
Hosting of advt. for vendor enlistment. Ref: NSPCL/DGP/C&M/A5/2016 |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/01/2016-17 |
||||||||||||||||||||||||||||||||||||||||
NIT. NO.NSPCL/DGP/ C&M / A4/ 2016 |
||||||||||||||||||||||||||||||||||||||||
NIT. NO.NSPCL/ROURKELA/16-17/01 |
||||||||||||||||||||||||||||||||||||||||
DOMESTIC COMPETITIVE BIDDING |
||||||||||||||||||||||||||||||||||||||||
1. NSPCL,Transportation of material from all over India to NSPCL Rourkela & Vice Versa 2. Biennial Contract for Pressure Parts Maintenance. |
||||||||||||||||||||||||||||||||||||||||
(i) Tender No 1614070- Biennial Contract for Pressure Parts Maintenance. (ii) Tender No- 1603052 -Transportation of materials from all over India to NSPCL & vice versa. |
||||||||||||||||||||||||||||||||||||||||
Corrigendum of NIEA ( AMC of C&I Works ) |
||||||||||||||||||||||||||||||||||||||||
Renovation of B-29 & B-34 Sector-03 into NSPCL Field Hostel/ Transit Accommodation |
||||||||||||||||||||||||||||||||||||||||
Development of areas near Construction Office at NSPCL, Rourkela |
||||||||||||||||||||||||||||||||||||||||
(Package-D)Construction of Dining Hall at Kalpataru-Rourkela & Dining & Kitchen Room-Lathikata & Civil Works at Vaishnodevi Mand |
||||||||||||||||||||||||||||||||||||||||
(Package-C) Construction of Class Rooms(Sec-02-Rourkela & Lathikata) & Laboratory at Sector-20,Rourkela under CSR Activities a |
||||||||||||||||||||||||||||||||||||||||
(Package-C) Construction of Class Rooms(Sec-02-Rourkela & Lathikata) & Laboratory at Sector-20,Rourkela under CSR Activities a |
||||||||||||||||||||||||||||||||||||||||
(Package-A) Construction of Class Room (02 |
||||||||||||||||||||||||||||||||||||||||
Transportation of Materials from all over India |
||||||||||||||||||||||||||||||||||||||||
Augmentation of Existing Ash Slurry System at NSPCL, Rourkela |
||||||||||||||||||||||||||||||||||||||||
Biennial Contract for Pressure Parts Maintenance. |
||||||||||||||||||||||||||||||||||||||||
Repair and Painting of External Surface of RCC Chimney at NSPCL, Durgapur |
||||||||||||||||||||||||||||||||||||||||
Removal and relaying of slurry disposal pipe lines and miscellaneous mechanical jobs in Boi |
||||||||||||||||||||||||||||||||||||||||
Hiring of Vehicles for different Departments |
||||||||||||||||||||||||||||||||||||||||
Expression of Interest for sale of Ash |
||||||||||||||||||||||||||||||||||||||||
Biennial Ash Dyke Maintenance (2017 & 2018) at NSPCL,Rourkela |
||||||||||||||||||||||||||||||||||||||||
Painting of Plant Building,Boundary Wall of Plant & Brick Paving for Plant Beautification inside CPP-II,NSPCL,Rourkela |
||||||||||||||||||||||||||||||||||||||||
Structural Painting of TG Hall Building inside CPP-II,NSPCL, Rourkela |
||||||||||||||||||||||||||||||||||||||||
Fencing of Construction Areas of Expansion Project(IX250MW at NSPCL,Rourkela) |
||||||||||||||||||||||||||||||||||||||||
Renovation of Quarters for Bachelor Accomodation at NSPCL,Rourkela |
||||||||||||||||||||||||||||||||||||||||
DOMESTIC COMPETITIVE BIDDING |
||||||||||||||||||||||||||||||||||||||||
DOMESTIC COMPETITIVE BIDDING |
||||||||||||||||||||||||||||||||||||||||
NOTICE INVITING ENLISTMENT APPLICATION ( NIEA) |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/16-17/03 |
||||||||||||||||||||||||||||||||||||||||
DOMESTIC COMPETITIVE BIDDING |
||||||||||||||||||||||||||||||||||||||||
OT ET 03-2016 CS16115 NTPC |
||||||||||||||||||||||||||||||||||||||||
OT ET 03-2016 CS16109 NTPC |
||||||||||||||||||||||||||||||||||||||||
OT ET 03 2016 CS 16123 |
||||||||||||||||||||||||||||||||||||||||
Procurement of grinding elements for coal Mill |
||||||||||||||||||||||||||||||||||||||||
BMC for Maintenance of Milling System and Rotary Equipments. |
||||||||||||||||||||||||||||||||||||||||
BMC of TG and Offsite |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/16-17/02 |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/16-17/02 |
||||||||||||||||||||||||||||||||||||||||
NIT and QR OT ET 02 2016 CS16068 |
||||||||||||||||||||||||||||||||||||||||
1. Ref. No. NSPCL/DGP/C&M/A4/2016 Dated 25.05.2016 - Annual Maintenance Contract for Ash Disposal Line - Pkg. No. B26 2. Ref. No. NSPCL/DGP/C&M/A5/2016 Dated 21.06.2016 - Disposal of Pond Ashfrom Ash Dyke of NSPCL-Durgapur - Pkg.No. B27 |
||||||||||||||||||||||||||||||||||||||||
Hosting of advt. for vendor enlistment. Ref: NSPCL/DGP/C&M/A5/2016 |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/01/2016-17 |
||||||||||||||||||||||||||||||||||||||||
NIT. NO.NSPCL/DGP/ C&M / A4/ 2016 |
||||||||||||||||||||||||||||||||||||||||
NIT. NO.NSPCL/ROURKELA/16-17/01 |
||||||||||||||||||||||||||||||||||||||||
2015-16 | ||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/04/2015-16 |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/04/2015-16 |
||||||||||||||||||||||||||||||||||||||||
NIT. NO.NSPCL/ROURKELA/15-16/06 | ||||||||||||||||||||||||||||||||||||||||
NIT NSPCL/DGP/C&M/OT/e-Tender/01/2016 CORRIGENDUM - I |
||||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 01 / 2016 ( 17.02.2016 to 03.03.2016) |
|||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/15-16/05 |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/03/2015-16 |
||||||||||||||||||||||||||||||||||||||||
IFB No.: CC/C&M-C-381(R) FOR DURGAPUR POWER PROJECT-III (2x20 MW) LOCATED IN DISTRICT BURDWAN, STATE OF WEST BENGAL, INDIA |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 CORRIGENDUM - 9 |
||||||||||||||||||||||||||||||||||||||||
NIT no : NSPCL/ Rourkela/ 15-16/ 02 and tender no 9000001971 |
||||||||||||||||||||||||||||||||||||||||
REF: NIT NSPCL/DGP/C&M/OT/e-Tender/08/2015 |
||||||||||||||||||||||||||||||||||||||||
NIT NO : NSPCL/ ROURKELA/ 15-16/ 02 and Tender No. 9000001971 |
||||||||||||||||||||||||||||||||||||||||
REF.NO.NSPCL/ROURKELA/15-16/03 Corrigendum |
||||||||||||||||||||||||||||||||||||||||
EOI No. NSPCL/ROURKEKLA |
||||||||||||||||||||||||||||||||||||||||
|
NIT.NO.NSPCL/ROURKELA/15-16/02 |
|||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
REF.NO. NSPCL/ROURKELA/15-16/03 |
|||||||||||||||||||||||||||||||||||||||
|
Ref.No. NSPCL/DGP/ C&M / OT/e-Tender / 08 / 2015 Tender Ref. No. 2800000329 |
|||||||||||||||||||||||||||||||||||||||
|
Ref.No. NSPCL/DGP/ C&M / OT/e-Tender / 08 / 2015 Tender Ref. No. 2800000328 |
|||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/02/2015-16 |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 07 / 2015 CORRIGENDUM - 01 |
|||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 |
|||||||||||||||||||||||||||||||||||||||
|
Ref.No. NSPCL/DGP/ C&M / A4/ 2015 |
|||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 07 / 2015 |
|||||||||||||||||||||||||||||||||||||||
|
NIT NO. : 0230/CS/OT/01/2015-16 Corrigendum | |||||||||||||||||||||||||||||||||||||||
EXPRESSION OF INTEREST (EOI) FOR LIFTING POND ASH from PP-II, NSPCL,Bhilai |
||||||||||||||||||||||||||||||||||||||||
|
NIT NO. : 0230/CS/OT/01/2015-16 |
|||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 CORRIGENDUM - 5 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/C&M /OT / ET / 05 / 2015 CORRIGENDUM - 1 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 06 / 2015 | ||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 CORRIGENDUM - 3 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 CORRIGENDUM - 4 |
||||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 |
|||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/CS/OT/ET/05/14130 |
|||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 |
||||||||||||||||||||||||||||||||||||||||
|
NIT.NO.NSPCL/ROURKELA/NIT/01/15-16 |
|||||||||||||||||||||||||||||||||||||||
|
Procurement of 0.78 MMT of imported Coal for Bhilai PP-III (2x250 MW) IFB Ref: CC/C&M/C-390 dtd. 15.05.15 |
|||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 |
|||||||||||||||||||||||||||||||||||||||
|
IFB No: CC-C&M-C- 390 Procurement of Imported Coal for NSPCL Bhilai Power Plant-III (2x250 MW) |
|||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/07/2014-15 | ||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / e-Tender / 03 / 2015 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / e-Tender / 03 / 2015 |
||||||||||||||||||||||||||||||||||||||||
NIT. No: NSPCL/ROURKELA/06/14-15 |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
EPC PACKAGE FOR DURGAPUR POWER PROJECT-III (2x20 MW) LOCATED IN DISTRICT BURDWAN, STATE OF WEST BENGAL, INDIA IFB No.: CC/C&M-C-381 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / e-Tender / 03 / 2015 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / e-Tender / 01 / 2015 |
||||||||||||||||||||||||||||||||||||||||
NIT. NO:NSPCL/ROURKELA/06/14-15 |
||||||||||||||||||||||||||||||||||||||||
|
Abridged NIT ET 03 2015 CS14140 |
|||||||||||||||||||||||||||||||||||||||
|
Abridged NIT ET 03 2015 CS14139 |
|||||||||||||||||||||||||||||||||||||||
|
Abridged NIT ET 03 2015 CS14141 |
|||||||||||||||||||||||||||||||||||||||
|
FreeDisplyAbridged NIT ET 03 2015 PUR 140173 |
|||||||||||||||||||||||||||||||||||||||
|
Free displayAbridged NIT ET 03 2015 PUR 140185 |
|||||||||||||||||||||||||||||||||||||||
|
Free DisplayAbridged NIT ET 03 2015 PUR 140184 | |||||||||||||||||||||||||||||||||||||||
CORRIGENDUM -1 NIT.NO.NSPCL/ROURKELA/07/14-15 |
||||||||||||||||||||||||||||||||||||||||
(NIEA) No. NSPCL/ROURKELA/C&M/VE/01/14-15 |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/07/14-15 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / e-Tender / 01 / 2015 |
||||||||||||||||||||||||||||||||||||||||
Ref No: 0230/CS/OT/06/2014 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / 02 / 2015 |
||||||||||||||||||||||||||||||||||||||||
|
NSPCL/DGP/C&M/ 03 /2015 Date 16.01.2015 |
|||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/06/2014 |
||||||||||||||||||||||||||||||||||||||||
Ref. NO.NSPCL/RKL/C&M/VE-01/14-15 |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/06/14-15 |
||||||||||||||||||||||||||||||||||||||||
CORRIGENDUM #2 NIT No. NSPCL/DGP/ C&M/07/2014 |
||||||||||||||||||||||||||||||||||||||||
CORRIGENDUM-2 NIT.NO.NSPCL/ROURKELA/05/14-15 | ||||||||||||||||||||||||||||||||||||||||
Corrigendum1 NIT No. NSPCL/DGP/ C&M/07/2014 |
||||||||||||||||||||||||||||||||||||||||
CORRIGENDUM-1 NIT.NO.NSPCL/ROURKELA/05/14-15 | ||||||||||||||||||||||||||||||||||||||||
Corrigendum NIT.NO.NSPCL/ROURKELA/04/14-15 |
||||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / 07 / 2014 |
|||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/05/14-15 |
||||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/C&M/06/2014 PKG No. CS14091 |
|||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/03/14-15 |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/04/14-15 |
||||||||||||||||||||||||||||||||||||||||
132 KV Bays... Extn of sale date
11 KN Ring Main.... Correction in PP-II |
||||||||||||||||||||||||||||||||||||||||
IFB Ref No.- CC/C&M/C-359 dated 20.10.14 |
||||||||||||||||||||||||||||||||||||||||
IFB Ref no. - CC/C&M/C-360 dated 20.10.14 |
||||||||||||||||||||||||||||||||||||||||
IFB No.: CC/C&M-C-351 R&M Work OF DISTRIBUTED CONTROL SYSTEM FOR DURGAPUR CAPTIVE POWER PLANT -II (2X60MW) LOCATED IN DISTRICT BURDWAN, STATE OF WEST BENGAL, INDIA |
||||||||||||||||||||||||||||||||||||||||
|
(CS- 1416053 ) Setting up 11 KV Ring Main system along with associated equipments for Rourkela PP-III ( 1 X 250 MW) | |||||||||||||||||||||||||||||||||||||||
|
NIT.NO.NSPCL/ROURKELA/02/14-15 NSPCL, Rourkela invites Sealed Tender for the works from reputed Agencies | |||||||||||||||||||||||||||||||||||||||
IFB/NIT NO: 0230/CS/OT/04/2014 |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
|
Procurement of Imported Coal for NSPCL Bhilai Power Plant-III (2x250 MW) IFB No: CC-C&M-C- 350 |
|||||||||||||||||||||||||||||||||||||||
PUR/ 140088 Procurement of Coal Mill Gear Box PUR/ 140089 Design, Manufacturing, Supply of 5.332/MVAr, 33 KV, Current Limiting Series Reactor |
||||||||||||||||||||||||||||||||||||||||
|
International Competitive Bidding DETAILED INVITATION FOR BIDS IFB No.: CC&M-C-347-211 Date of Issue: 24.07.2014 |
|||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/02/2014 | ||||||||||||||||||||||||||||||||||||||||
|
(DOMESTIC COMPETITIVE BIDDING) DETAILED INVITATION FOR BIDS IFB No.: CC&M-C-336-231 Date of Issue: 18.06.2014 NAME:Installation of Variable Frequency Drive (VFD) Package for One |
|||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
|
Corrigendum no-1 for NIT no-01/14-15 |
|||||||||||||||||||||||||||||||||||||||
|
NIT.NO.NSPCL/ROURKELA/01/14-15 |
|||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
NIT NO. : 0230/CS/OT/01/2014 |
|||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / 03 / 2014 |
|||||||||||||||||||||||||||||||||||||||
Package: Dry Ash Extraction and Transportation Plant Package for Bhilai PP-II (2x30 + 1x14)MW |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
|
IFB/NIT NO: 0230/OT/05/2014 |
|||||||||||||||||||||||||||||||||||||||
Corrigendum No.2 to NIT NO.NSPCL/ROURKELA/05/13-14,Dated.18.01.2014 |
||||||||||||||||||||||||||||||||||||||||
|
NIT NO. : 0230/CS/OT/03/2013 |
|||||||||||||||||||||||||||||||||||||||
Corrigendum No.1 to NIT NO.NSPCL/ROURKELA/05/13-14,Dated.18.01.2014 |
||||||||||||||||||||||||||||||||||||||||
|
Corrigendum No.1 to NIT NO.NSPCL/ROURKELA/05/13-14,Dated.18.01.2014 |
|||||||||||||||||||||||||||||||||||||||
IFB No.: CC/C&M/C-310 Package: R&M Work of ESP Renovation& Retrofitting at Durgapur CPP-II (2X60MW) |
||||||||||||||||||||||||||||||||||||||||
EOI NO: NSPCL/ROURKELA/06/13-14 |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/OT/05/2014 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / 02 / 2014
|
||||||||||||||||||||||||||||||||||||||||
Corrigendum-2 to IFB CC/C&M/C-308 dated 28.01.14 |
||||||||||||||||||||||||||||||||||||||||
|
IFB No.: CC/C&M/C-308 Package: Replacement/renovation of RAPH of Both Units for Rourkela Captive Power Plant-II (2X60MW) |
|||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
Corrigendum for NSPCL BHILAI Enlistment of venders(for 3 year period) for 2X 250 MW Expansion Plant , For 74 MW Power Plant-II &Township |
||||||||||||||||||||||||||||||||||||||||
|
NIT.NO.NSPCL/ROURKELA/05/13-14 DATE: 18.01.2014 |
|||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
|
|||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / 01 / 2014
|
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
Ref. No. NSPCL/DGP/ C&M/ CS / B / 2013 CORRIGENDUM Date - 21.12.2013 Invitation of Applications for Vendor Enlistment |
|||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/03/2013 NSPCL-Bhilai invites tenders for following packages of Exp. Power Plant, PP-II & Township : |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/03/2013 NSPCL-Bhilai invites tenders for following packages for its Power Plant-II |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
NIT NO : 0230/CS/OT/03/2013 NSPCL Bhilai invite applications for enlistment of vendors (for 3 year period) |
||||||||||||||||||||||||||||||||||||||||
NIT- 04/13-14 |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
Ref.No. NIT- 03/13-14 |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / 05 / 2013 | ||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
CORIGENDUM NIT No. : 02/13-14 Invitation of Application for Vendor Enlistment |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
Renovation & modernization of Fire Detection & Protection system for coal Handling Plant & fuel Oil area at NSPCL, Rourkela, CPP ? II (2X60MW) & INVITATION OF APPLICATIONS FOR VENDOR ENLISTMENT FOR NIT NO 02/13-14 |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
Construction of Ash Dyke D (Lagoon 1 & 2) for Rourkela Captive Power Plant-II (2X60MW). |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
NIT NO 01/13-14 DT 04/06/2013 OF ANNEXURE A FOR PUBLICATION IN NEWSPAPER AND ANNEXURE B DETAILED NIT |
||||||||||||||||||||||||||||||||||||||||
Installation of Variable Frequency Drive (VFD) Package for One Unit of Bhilai Expansion Power Plant (2 X 250 MW) at Bhilai, Chhattisgarh |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/04/2015-16 |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/04/2015-16 |
||||||||||||||||||||||||||||||||||||||||
NIT. NO.NSPCL/ROURKELA/15-16/06 | ||||||||||||||||||||||||||||||||||||||||
NIT NSPCL/DGP/C&M/OT/e-Tender/01/2016 CORRIGENDUM - I |
||||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 01 / 2016 ( 17.02.2016 to 03.03.2016) |
|||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/15-16/05 |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/03/2015-16 |
||||||||||||||||||||||||||||||||||||||||
IFB No.: CC/C&M-C-381(R) FOR DURGAPUR POWER PROJECT-III (2x20 MW) LOCATED IN DISTRICT BURDWAN, STATE OF WEST BENGAL, INDIA |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 CORRIGENDUM - 9 |
||||||||||||||||||||||||||||||||||||||||
NIT no : NSPCL/ Rourkela/ 15-16/ 02 and tender no 9000001971 |
||||||||||||||||||||||||||||||||||||||||
REF: NIT NSPCL/DGP/C&M/OT/e-Tender/08/2015 |
||||||||||||||||||||||||||||||||||||||||
NIT NO : NSPCL/ ROURKELA/ 15-16/ 02 and Tender No. 9000001971 |
||||||||||||||||||||||||||||||||||||||||
REF.NO.NSPCL/ROURKELA/15-16/03 Corrigendum |
||||||||||||||||||||||||||||||||||||||||
EOI No. NSPCL/ROURKEKLA |
||||||||||||||||||||||||||||||||||||||||
|
NIT.NO.NSPCL/ROURKELA/15-16/02 |
|||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
REF.NO. NSPCL/ROURKELA/15-16/03 |
|||||||||||||||||||||||||||||||||||||||
|
Ref.No. NSPCL/DGP/ C&M / OT/e-Tender / 08 / 2015 Tender Ref. No. 2800000329 |
|||||||||||||||||||||||||||||||||||||||
|
Ref.No. NSPCL/DGP/ C&M / OT/e-Tender / 08 / 2015 Tender Ref. No. 2800000328 |
|||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/02/2015-16 |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 07 / 2015 CORRIGENDUM - 01 |
|||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 |
|||||||||||||||||||||||||||||||||||||||
|
Ref.No. NSPCL/DGP/ C&M / A4/ 2015 |
|||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 07 / 2015 |
|||||||||||||||||||||||||||||||||||||||
|
NIT NO. : 0230/CS/OT/01/2015-16 Corrigendum | |||||||||||||||||||||||||||||||||||||||
EXPRESSION OF INTEREST (EOI) FOR LIFTING POND ASH from PP-II, NSPCL,Bhilai |
||||||||||||||||||||||||||||||||||||||||
|
NIT NO. : 0230/CS/OT/01/2015-16 |
|||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 CORRIGENDUM - 5 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/C&M /OT / ET / 05 / 2015 CORRIGENDUM - 1 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 06 / 2015 | ||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 CORRIGENDUM - 3 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 CORRIGENDUM - 4 |
||||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 |
|||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/CS/OT/ET/05/14130 |
|||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 |
||||||||||||||||||||||||||||||||||||||||
|
NIT.NO.NSPCL/ROURKELA/NIT/01/15-16 |
|||||||||||||||||||||||||||||||||||||||
|
Procurement of 0.78 MMT of imported Coal for Bhilai PP-III (2x250 MW) IFB Ref: CC/C&M/C-390 dtd. 15.05.15 |
|||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / OT/e-Tender / 04 / 2015 |
|||||||||||||||||||||||||||||||||||||||
|
IFB No: CC-C&M-C- 390 Procurement of Imported Coal for NSPCL Bhilai Power Plant-III (2x250 MW) |
|||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/07/2014-15 | ||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / e-Tender / 03 / 2015 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / e-Tender / 03 / 2015 |
||||||||||||||||||||||||||||||||||||||||
NIT. No: NSPCL/ROURKELA/06/14-15 |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
EPC PACKAGE FOR DURGAPUR POWER PROJECT-III (2x20 MW) LOCATED IN DISTRICT BURDWAN, STATE OF WEST BENGAL, INDIA IFB No.: CC/C&M-C-381 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / e-Tender / 03 / 2015 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / e-Tender / 01 / 2015 |
||||||||||||||||||||||||||||||||||||||||
NIT. NO:NSPCL/ROURKELA/06/14-15 |
||||||||||||||||||||||||||||||||||||||||
|
Abridged NIT ET 03 2015 CS14140 |
|||||||||||||||||||||||||||||||||||||||
|
Abridged NIT ET 03 2015 CS14139 |
|||||||||||||||||||||||||||||||||||||||
|
Abridged NIT ET 03 2015 CS14141 |
|||||||||||||||||||||||||||||||||||||||
|
FreeDisplyAbridged NIT ET 03 2015 PUR 140173 |
|||||||||||||||||||||||||||||||||||||||
|
Free displayAbridged NIT ET 03 2015 PUR 140185 |
|||||||||||||||||||||||||||||||||||||||
|
Free DisplayAbridged NIT ET 03 2015 PUR 140184 | |||||||||||||||||||||||||||||||||||||||
CORRIGENDUM -1 NIT.NO.NSPCL/ROURKELA/07/14-15 |
||||||||||||||||||||||||||||||||||||||||
(NIEA) No. NSPCL/ROURKELA/C&M/VE/01/14-15 |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/07/14-15 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / e-Tender / 01 / 2015 |
||||||||||||||||||||||||||||||||||||||||
Ref No: 0230/CS/OT/06/2014 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / 02 / 2015 |
||||||||||||||||||||||||||||||||||||||||
|
NSPCL/DGP/C&M/ 03 /2015 Date 16.01.2015 |
|||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/06/2014 |
||||||||||||||||||||||||||||||||||||||||
Ref. NO.NSPCL/RKL/C&M/VE-01/14-15 |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/06/14-15 |
||||||||||||||||||||||||||||||||||||||||
CORRIGENDUM #2 NIT No. NSPCL/DGP/ C&M/07/2014 |
||||||||||||||||||||||||||||||||||||||||
CORRIGENDUM-2 NIT.NO.NSPCL/ROURKELA/05/14-15 | ||||||||||||||||||||||||||||||||||||||||
Corrigendum1 NIT No. NSPCL/DGP/ C&M/07/2014 |
||||||||||||||||||||||||||||||||||||||||
CORRIGENDUM-1 NIT.NO.NSPCL/ROURKELA/05/14-15 | ||||||||||||||||||||||||||||||||||||||||
Corrigendum NIT.NO.NSPCL/ROURKELA/04/14-15 |
||||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / 07 / 2014 |
|||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/05/14-15 |
||||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/C&M/06/2014 PKG No. CS14091 |
|||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/03/14-15 |
||||||||||||||||||||||||||||||||||||||||
NIT.NO.NSPCL/ROURKELA/04/14-15 |
||||||||||||||||||||||||||||||||||||||||
132 KV Bays... Extn of sale date
11 KN Ring Main.... Correction in PP-II |
||||||||||||||||||||||||||||||||||||||||
IFB Ref No.- CC/C&M/C-359 dated 20.10.14 |
||||||||||||||||||||||||||||||||||||||||
IFB Ref no. - CC/C&M/C-360 dated 20.10.14 |
||||||||||||||||||||||||||||||||||||||||
IFB No.: CC/C&M-C-351 R&M Work OF DISTRIBUTED CONTROL SYSTEM FOR DURGAPUR CAPTIVE POWER PLANT -II (2X60MW) LOCATED IN DISTRICT BURDWAN, STATE OF WEST BENGAL, INDIA |
||||||||||||||||||||||||||||||||||||||||
|
(CS- 1416053 ) Setting up 11 KV Ring Main system along with associated equipments for Rourkela PP-III ( 1 X 250 MW) | |||||||||||||||||||||||||||||||||||||||
|
NIT.NO.NSPCL/ROURKELA/02/14-15 NSPCL, Rourkela invites Sealed Tender for the works from reputed Agencies | |||||||||||||||||||||||||||||||||||||||
IFB/NIT NO: 0230/CS/OT/04/2014 |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
|
Procurement of Imported Coal for NSPCL Bhilai Power Plant-III (2x250 MW) IFB No: CC-C&M-C- 350 |
|||||||||||||||||||||||||||||||||||||||
PUR/ 140088 Procurement of Coal Mill Gear Box PUR/ 140089 Design, Manufacturing, Supply of 5.332/MVAr, 33 KV, Current Limiting Series Reactor |
||||||||||||||||||||||||||||||||||||||||
|
International Competitive Bidding DETAILED INVITATION FOR BIDS IFB No.: CC&M-C-347-211 Date of Issue: 24.07.2014 |
|||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/02/2014 | ||||||||||||||||||||||||||||||||||||||||
|
(DOMESTIC COMPETITIVE BIDDING) DETAILED INVITATION FOR BIDS IFB No.: CC&M-C-336-231 Date of Issue: 18.06.2014 NAME:Installation of Variable Frequency Drive (VFD) Package for One |
|||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
|
Corrigendum no-1 for NIT no-01/14-15 |
|||||||||||||||||||||||||||||||||||||||
|
NIT.NO.NSPCL/ROURKELA/01/14-15 |
|||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
NIT NO. : 0230/CS/OT/01/2014 |
|||||||||||||||||||||||||||||||||||||||
|
NIT No. NSPCL/DGP/ C&M / 03 / 2014 |
|||||||||||||||||||||||||||||||||||||||
Package: Dry Ash Extraction and Transportation Plant Package for Bhilai PP-II (2x30 + 1x14)MW |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
|
IFB/NIT NO: 0230/OT/05/2014 |
|||||||||||||||||||||||||||||||||||||||
Corrigendum No.2 to NIT NO.NSPCL/ROURKELA/05/13-14,Dated.18.01.2014 |
||||||||||||||||||||||||||||||||||||||||
|
NIT NO. : 0230/CS/OT/03/2013 |
|||||||||||||||||||||||||||||||||||||||
Corrigendum No.1 to NIT NO.NSPCL/ROURKELA/05/13-14,Dated.18.01.2014 |
||||||||||||||||||||||||||||||||||||||||
|
Corrigendum No.1 to NIT NO.NSPCL/ROURKELA/05/13-14,Dated.18.01.2014 |
|||||||||||||||||||||||||||||||||||||||
IFB No.: CC/C&M/C-310 Package: R&M Work of ESP Renovation& Retrofitting at Durgapur CPP-II (2X60MW) |
||||||||||||||||||||||||||||||||||||||||
EOI NO: NSPCL/ROURKELA/06/13-14 |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/OT/05/2014 |
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / 02 / 2014
|
||||||||||||||||||||||||||||||||||||||||
Corrigendum-2 to IFB CC/C&M/C-308 dated 28.01.14 |
||||||||||||||||||||||||||||||||||||||||
|
IFB No.: CC/C&M/C-308 Package: Replacement/renovation of RAPH of Both Units for Rourkela Captive Power Plant-II (2X60MW) |
|||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
Corrigendum for NSPCL BHILAI Enlistment of venders(for 3 year period) for 2X 250 MW Expansion Plant , For 74 MW Power Plant-II &Township |
||||||||||||||||||||||||||||||||||||||||
|
NIT.NO.NSPCL/ROURKELA/05/13-14 DATE: 18.01.2014 |
|||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
|
|||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / 01 / 2014
|
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
Ref. No. NSPCL/DGP/ C&M/ CS / B / 2013 CORRIGENDUM Date - 21.12.2013 Invitation of Applications for Vendor Enlistment |
|||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/03/2013 NSPCL-Bhilai invites tenders for following packages of Exp. Power Plant, PP-II & Township : |
||||||||||||||||||||||||||||||||||||||||
NIT NO. : 0230/CS/OT/03/2013 NSPCL-Bhilai invites tenders for following packages for its Power Plant-II |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
NIT NO : 0230/CS/OT/03/2013 NSPCL Bhilai invite applications for enlistment of vendors (for 3 year period) |
||||||||||||||||||||||||||||||||||||||||
NIT- 04/13-14 |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
Ref.No. NIT- 03/13-14 |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
NIT No. NSPCL/DGP/ C&M / 05 / 2013 | ||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
CORIGENDUM NIT No. : 02/13-14 Invitation of Application for Vendor Enlistment |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
Renovation & modernization of Fire Detection & Protection system for coal Handling Plant & fuel Oil area at NSPCL, Rourkela, CPP ? II (2X60MW) & INVITATION OF APPLICATIONS FOR VENDOR ENLISTMENT FOR NIT NO 02/13-14 |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
Construction of Ash Dyke D (Lagoon 1 & 2) for Rourkela Captive Power Plant-II (2X60MW). |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
As per detailed NIT |
||||||||||||||||||||||||||||||||||||||||
NIT NO 01/13-14 DT 04/06/2013 OF ANNEXURE A FOR PUBLICATION IN NEWSPAPER AND ANNEXURE B DETAILED NIT |
||||||||||||||||||||||||||||||||||||||||
Installation of Variable Frequency Drive (VFD) Package for One Unit of Bhilai Expansion Power Plant (2 X 250 MW) at Bhilai, Chhattisgarh |